MCQOPTIONS
Saved Bookmarks
| 1. |
How much capacity Bearas Small Power Project (SHP) at Biaras Dras in Kargil, Jammu and Kashmir was commissioned on 4th November, 2017? |
| A. | 1.5 MW |
| B. | 10.5 MW |
| C. | 21.5 MW |
| D. | 31.5 MW |
| Answer» B. 10.5 MW | |