MCQOPTIONS
Bookmark
Saved Bookmarks
→
Pavement Design
→
Bituminous Material Tests 1 in Pavement Design
→
How is R-value related to C-value?..
1.
How is R-value related to C-value?
A.
R=C5
B.
R=1/C5
C.
R=C5
D.
R=1/C1/5
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
What is the rate of exudation pressure applied on the subgrade for the stabilometer test?
The C-value of a gravel base course ranges from 22 to 30.
Find the thickness of the pavement using R-value method for the following details.EWL = 36,345,233R = 42C = 88
Calculate the equivalent C-value for a pavement having the details as mentioned in the table below.
In order to find the thickness of the pavement, it is necessary to find the equivalent C value of the pavement materials.
Calculate the fifteen-year traffic index for the data given below. Assume 50% increase in traffic in the fifteen-year period.
A vehicle has four axles, what would be the equivalent wheel load (EWL) constant used for the R-value design method?
What is the typical R-value for a well-graded crushed stone base course?
What is the equation to find the thickness of pavement using the R-value?
How is R-value related to C-value?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply