1.
FOR_STOREYED_BUILDING_PLINTH_AREA_ESTIMATE_IS_NOT_PREPARED_FOR_EACH_STOREY_SEPARATELY.?$
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
A large work or project may consists of several building or small works and each of these work is known as ___________
________________ is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.
__________ is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.
Approximate cost of sewerage project for a population of one [email protected] Rs. 10/- head works out as Rs. 10 lakh.
FOR_STOREYED_BUILDING_PLINTH_AREA_ESTIMATE_IS_NOT_PREPARED_FOR_EACH_STOREY_SEPARATELY.?$
________________is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.$
__________ is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.$
The term ______________ is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.
A large work or project may consists of several building or small works and each of these work is known as___________
_______________ estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.