MCQOPTIONS
Saved Bookmarks
| 1. |
Control of the process average or mean quality level is usually done with the ___________ control chart. |
| A. | X bar control chart |
| B. | S control chart |
| C. | R chart |
| D. | P chart |
| Answer» B. S control chart | |