1.
Construction or installation at a culvert site generally results in disturbance of the site soil.
A.
True
B.
False
Answer» B. False
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
_________ culverts have a concrete (sometimes other materials can be used too) floor allowing the water to flow smoothly through it.
An _________ culvert is normally a low profile culvert. It allows them to be installed without disturbing the causeway as it will span over the entire drainage width.
The process of removing culverts, which is becoming increasingly prevalent, is known as ___________
________CULVERTS_HAVE_A_CONCRETE_(SOMETIMES_OTHER_MATERIALS_CAN_BE_USED_TOO)_FLOOR_ALLOWING_THE_WATER_TO_FLOW_SMOOTHLY_THROUGH_IT.?$
An _____culvert is normally a low profile culvert. It allows them to be installed without disturbing the causeway as it will span over the entire drainage width?
The process of removing culverts, which is becoming increasingly prevalent, is known as __________?
A culvert can be used to span over a canyon, or depression, or even over a freeway or roadway.
Box culverts can be defined as a passage for water over a natural ground having a deck slab over it as path way for vehicles.
Construction or installation at a culvert site generally results in disturbance of the site soil.
Culverts cannot be constructed of a variety of materials including cast-in-place or precast concrete.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply