MCQOPTIONS
Saved Bookmarks
| 1. |
Consider the following statements with respect to End of Train Telemetry (EoTT) equipment to be acquired by Indian Railways:nI. It is used to establish communication between the locomotive driver and the last wagon of the train to ensure that the train is running with all coaches/wagons as a complete unit.nII. It comprises of two units one unit called cab display unit (CDU) fitted on the locomotive and the other is sense and brake unit (SBU) fitted on the last coach or wagon of the train.nChoose the correct option |
| A. | Only I |
| B. | Only II |
| C. | Both I and II |
| D. | Neither I nor II |
| Answer» D. Neither I nor II | |