MCQOPTIONS
Saved Bookmarks
| 1. |
Consider the following loop MOV CX, 8000hL1 : DEC CX JNZ L1The processor is running at \(\frac{14.7456}{3}\) MHz and DEC CX requires 2 clock cycles and JNZ requires 16 clock cycles. The total time taken is nearly |
| A. | 0.01 s |
| B. | 0.12 s |
| C. | 3.66 s |
| D. | 4.19 s |
| Answer» C. 3.66 s | |