1.

Consider the following loop MOV CX, 8000hL1 : DEC CX JNZ L1The processor is running at \(\frac{14.7456}{3}\) MHz and DEC CX requires 2 clock cycles and JNZ requires 16 clock cycles. The total time taken is nearly

A. 0.01 s
B. 0.12 s
C. 3.66 s
D. 4.19 s
Answer» C. 3.66 s


Discussion

No Comment Found

Related MCQs