1.

Calculate the amount of air required for the equalization tank with the following details
Flow: 500 m3/h

A. nBOD load: 800 mg/L
B. t950 m<sup>3</sup>/hr
C. t800 m<sup>3</sup>/hr
D. t2000 m<sup>3</sup>/hr
E. t785 m<sup>3</sup>/hr
Answer» D. t2000 m<sup>3</sup>/hr