1. |
IN_WHICH_OF_THE_FOLLOWING_SEDIMENTATION_TANKS,_THE_FLOW_MAY_BE_EITHER_HORIZONTAL_OR_VERTICAL??$ |
A. | Circular |
B. | Rectangular |
C. | Fill and draw type |
D. | Continuous flow |
Answer» E. | |
2. |
The vertical type of sedimentation tanks are usually in _________ shape.$ |
A. | Circular |
B. | Rectangular |
C. | Semi-circular |
D. | Cylindrical |
Answer» B. Rectangular | |
3. |
What is the maximum permissible velocity in horizontal flow type sedimentation tank?$ |
A. | 0.2 m/s |
B. | 0.3 m/s |
C. | 0.5 m/s |
D. | 1 m/s |
Answer» C. 0.5 m/s | |
4. |
________ is provided after activated sludge process. |
A. | Primary sedimentation tank |
B. | Flocculation tank |
C. | Secondary sedimentation tank |
D. | Sand filter |
Answer» D. Sand filter | |
5. |
Sludge is disposed through _______ |
A. | Hopper bottom |
B. | Sludge pump |
C. | Deflector |
D. | Launder |
Answer» C. Deflector | |
6. |
Why are the baffle walls provided? |
A. | Prevent short circuit |
B. | Abstruct flow |
C. | Reduce velocity |
D. | Collect sediment |
Answer» B. Abstruct flow | |
7. |
How many hours does the removing of Settleable particles require in fill and draw type of sedimentation tanks? |
A. | 3-6 |
B. | 6-9 |
C. | 6-12 |
D. | 12-15 |
Answer» D. 12-15 | |
8. |
What is the time period for which the water is stored in fill and draw type of sedimentation tank? |
A. | 48 hours |
B. | 24 hours |
C. | 52 hours |
D. | 76 hours |
Answer» C. 52 hours | |
9. |
How many types of sedimentation tanks are present based on the shape of the tank? |
A. | 2 |
B. | 3 |
C. | 4 |
D. | 5 |
Answer» B. 3 | |
10. |
How many types of sedimentation tanks are there based on the method of operation? |
A. | 2 |
B. | 4 |
C. | 5 |
D. | 7 |
Answer» B. 4 | |
11. |
What is the accumulated layer at the bottom of the tank called as? |
A. | Flocs |
B. | Sediment |
C. | Sludge |
D. | Sewage |
Answer» D. Sewage | |
12. |
Sedimentation tank is also called as settling tank. |
A. | True |
B. | False |
Answer» B. False | |
13. |
The tanks built with mechanical means for continuous removal of solids being deposited by sedimentation are called _________ |
A. | Clarifiers |
B. | Settling basins |
C. | Sedimentation tanks |
D. | Eco-pons |
Answer» B. Settling basins | |
14. |
What are the ponds constructed for removing entrained solids called? |
A. | Clarifiers |
B. | Settling basins |
C. | Eco-ponds |
D. | Ditches |
Answer» C. Eco-ponds | |
15. |
Sedimentation is a process using gravity to remove suspended solids from water. |
A. | True |
B. | False |
Answer» B. False | |