MCQOPTIONS
Saved Bookmarks
This section includes 18 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
For which of the following reason SSMP is not used? |
A. | Minimizing sanitary sewer overflows |
B. | Minimizing infiltration/ inflow |
C. | Reducing sewer size |
D. | Maintaining the condition of a collection system |
Answer» D. Maintaining the condition of a collection system | |
2. |
What is the abbreviation of SSMP? |
A. | Storm and Sewage Management Plan |
B. | Sewer System Management Plan |
C. | Soil and Storm Management Plan |
D. | Storm System Management Plan |
Answer» C. Soil and Storm Management Plan | |
3. |
The type of wastewater treatment process for treating wastewater or industrial wastewater using aeration and biological flocs is called? |
A. | Active sludge process |
B. | Aeration |
C. | Biological aeration |
D. | Anaerobic digestion |
Answer» B. Aeration | |
4. |
THE_TYPE_OF_WASTEWATER_TREATMENT_PROCESS_FOR_TREATING_WASTEWATER_OR_INDUSTRIAL_WASTEWATER_USING_AERATION_AND_BIOLOGICAL_FLOCS_IS_CALLED??$ |
A. | Active sludge process |
B. | Aeration |
C. | Biological aeration |
D. | Anaerobic digestion |
Answer» B. Aeration | |
5. |
For which of the following reason SSMP is not used?$ |
A. | Minimizing sanitary sewer overflows |
B. | Minimizing infiltration/ inflow |
C. | Reducing sewer size |
D. | Maintaining the condition of a collection system |
Answer» D. Maintaining the condition of a collection system | |
6. |
What is the abbreviation of SSMP?$ |
A. | Storm and Sewage Management Plan |
B. | Sewer System Management Plan |
C. | Soil and Storm Management Plan |
D. | Storm System Management Plan |
Answer» C. Soil and Storm Management Plan | |
7. |
SORP stands for? |
A. | Storm Overflow Response Plan |
B. | Sewer Overflow Response Plan |
C. | Sanitary Overflow Response Plan |
D. | Sewage Overflow Response Plan |
Answer» C. Sanitary Overflow Response Plan | |
8. |
The legal entity that is responsible for the wastewater collection system is called ___________ |
A. | Collection system agency |
B. | Sewer system agency |
C. | Water collection agency |
D. | Storm collection agency |
Answer» C. Water collection agency | |
9. |
SSMPs are used to minimize the number and impact of sanitary sewer overflows that occur. |
A. | True |
B. | False |
Answer» B. False | |
10. |
Which of these is the most common pipeline installation method? |
A. | Trench sewer construction |
B. | Storm sewer construction |
C. | Pipeline construction |
D. | Tunnel construction |
Answer» B. Storm sewer construction | |
11. |
The abbreviation of SUE is? |
A. | Subsurface utility engineering |
B. | Surface utility engineering |
C. | Storm usage engineering |
D. | Storm utility engineering |
Answer» B. Surface utility engineering | |
12. |
Which of the following factors mentioned below marks essential for planning sewer systems for a community? |
A. | Usage pattern |
B. | Terrain |
C. | Location |
D. | Wastewater flow |
Answer» E. | |
13. |
Combined sewer systems are no longer installed due to the water pollution problems they present. |
A. | True |
B. | False |
Answer» B. False | |
14. |
__________ is required to transport storm water runoff from roofs, parking lots, streets, and highways to a point of discharge. |
A. | Sanitary sewers |
B. | Storm sewers |
C. | Wastewater sewers |
D. | Water sewers |
Answer» C. Wastewater sewers | |
15. |
On which of the factors mentioned below, the type of the sewer installed does not depend on? |
A. | Usage pattern |
B. | Terrain |
C. | location |
D. | storm water |
Answer» E. | |
16. |
Sewer systems can also be referred as _________ |
A. | Sewage |
B. | Sewerage |
C. | Storm |
D. | Wastewater |
Answer» C. Storm | |
17. |
Pipeline networks are designed by engineers and installed by sewer contractors in accordance with federal and state regulations. |
A. | True |
B. | False |
Answer» B. False | |
18. |
The process that involves connecting pipelines and sewer appurtenances to transport waste to sewage treatment centres is called? |
A. | Connecting pipelines |
B. | Pipelines construction |
C. | Sewer construction |
D. | Sewage construction |
Answer» D. Sewage construction | |