

MCQOPTIONS
Saved Bookmarks
1. |
A non-pipeline system takes 50ns to process a task. The same task can be processed in six-segment pipeline with a clockcycle of 10ns. Determine approximately the speedup ratio of the pipeline for 500 tasks. |
A. | 6 |
B. | 4.95 |
C. | 5.7 |
D. | 5.5 |
Answer» C. 5.7 | |