1.

Which of the following is not an objective of quality control?

A. to produce qualitative items
B. to reduce companies cost through reduction of losses due to defects.
C. toenhance quality variation among same product category.
D. none of these
Answer» D. none of these
2.

Which of the following is not the objective of plant layout?

A. streamline the flow of materials through the plant.
B. facilitate the manufacturing process.
C. enhance materials handling cost.
D. none of these
Answer» D. none of these
3.

Which of the following is not a function of purchasing department?

A. receive purchase requisition
B. supplier selection
C. order placement
D. employee selection
Answer» E.
4.

Which of the following is not an objective of quality assurance?

A. to reduce the quality
B. to reduce cost
C. to increase productivity
D. all of these
Answer» B. to reduce cost
5.

Which of the following is not a part of production system?

A. input
B. output
C. transformation process
D. politics
Answer» E.
6.

Which of the following is not a part of product life cyclestage?

A. introduction phase
B. competition phase
C. maturity and saturation phase
D. none of these
Answer» C. maturity and saturation phase
7.

Which of the following is an input in manufacturing system?

A. capital
B. material
C. human resource
D. all of these
Answer» E.
8.

Which of the following is not a characteristic of intermittent productionsystem?

A. the flow of production is intermittent.
B. the volume of production is generally small.
C. a single product is manufactured in bulk.
D. none of these
Answer» D. none of these
9.

Which one of the following is not an objective of maintenancemanagement?

A. to reduce breakdown of machineries
B. to keep the machines and other facilities in a bad condition.
C. to keep the plant in good working condition
D. all of these
Answer» C. to keep the plant in good working condition
10.

Dispatch provides official authorization for

A. movement of materials to different work stations,
B. movement of tools and fixtures necessary for each operation,
C. beginning of work on each operation,
D. all of these
Answer» E.
11.

………… is the art and science of ensuring that all which occurs is inaccordance with the rules established and the instructions issued

A. operational plan
B. operational policy
C. operational mission
D. operational control
Answer» E.
12.

Which of the following is a ProductionPlanning?

A. factory planning,
B. process planning
C. operation planning
D. all of these
Answer» E.
13.

………………..is concerned with planning the details of the methodsrequired to perform each operation

A. factory planning,
B. process planning
C. operation planning
D. none of these
Answer» D. none of these
14.

In ……………………. the operations are located and the sequence of theseoperations in the production is determined

A. factory planning,
B. process planning
C. operation planning
D. none of these
Answer» C. operation planning
15.

Which of the following is not atechnique of work measurement

A. time study
B. amalgamation
C. work sampling
D. . predetermined motion and time study
Answer» C. work sampling
16.

Which of the following is not aRule for material handling?

A. make handling distances as short as possible
B. use right method and proper material handling
C. promote wasteful material handling methods
D. use mechanical equipment’s wherever it is useful
Answer» D. use mechanical equipment’s wherever it is useful
17.

Which of the following is a Rule for material handling?

A. make handling distances as short as possible
B. use right method and proper material handling
C. eliminate wasteful material handling methods
D. all of these
Answer» E.
18.

Which of the following is the objective of motion study?

A. to eliminate all non-productive and ineffective motions.
B. to develop more effective and productive patterns of movements
C. (a) and (b)
D. none
Answer» D. none
19.

Which of the following is not an Objective of material handling?

A. to reduce material handling cost
B. to increase production life cycle
C. better control of the flow of material
D. to ensure safety in the movement of goods
Answer» C. better control of the flow of material
20.

Which of the following is not an objective of MRP?

A. reduction in inventory cost
B. meeting delivery schedule
C. improve the performance of production
D. to decrease production efficiency
Answer» E.
21.

Which of the following is not a limitation of multi-story building?

A. materials handling becomes very complicated.
B. a lot of floor space is wasted on elevators, stairways and fire escapes.
C. natural lighting is poor
D. less land is required
Answer» E.
22.

Which of the following is not anobjective of good plant layout?

A. to improve productivity
B. to provide safety to employees
C. toincrease the number of accidents
D. to provide easy supervision
Answer» D. to provide easy supervision
23.

Which of the following is not a quality of good plant layout?

A. to reduce material handling cost
B. to provide enough production facility
C. to reduce labour efficiency
D. to provide ease of supervision
Answer» D. to provide ease of supervision
24.

Which of the following is not an advantage of single story building?

A. there is a greater flexibility in layout.
B. expansion is easily ensured by the removal of walls.
C. low cost of transportation and material handling charges
D. more land is required for building construction
Answer» E.
25.

Industrial buildings may be grouped under

A. single-storey buildings,
B. multi-storey buildings
C. (a) and (b)
D. none of these
Answer» D. none of these
26.

Which of the following is theobjective of plant layout

A. streamline the flow of materials through the plant.
B. facilitate the manufacturing process.
C. minimise materials handling cost.
D. all of these
Answer» E.
27.

Locating the plant nearer to the market is preferred if:

A. the products are subject to spoilage.
B. after sales services are promptly required very often.
C. (a) and (b)
D. none of these
Answer» D. none of these
28.

Which of the following factor affects the choice of the plant locationselection decision?

A. capital requirement.
B. government policy
C. climate conditions
D. all of these
Answer» E.
29.

Which of the following cost is associated with inventories?

A. carrying cost
B. ordering cost
C. over stocking cost
D. all of these
Answer» E.
30.

VED Analysis is related with

A. materials
B. spare parts
C. labour
D. overheads
Answer» C. labour
31.

The process of buying large quantities of items when its price is low sothat tentative profits can be obtained by selling them at higher prices is called……………..

A. speculative purchasing
B. group purchasing
C. tender purchasing
D. none of these
Answer» B. group purchasing
32.

Which of the following is a function of purchasing department?

A. receive purchase requisition
B. supplier selection
C. order placement
D. all of these
Answer» E.
33.

……………………….is the quantity that should be carried by the companyso that production is not affected before the next deliver arrives.

A. minimum stock level
B. maximum stock level
C. re order level
D. all of these
Answer» B. maximum stock level
34.

Which of the following is a way of codification?

A. numerical code
B. mnemonic code
C. alpha-numeric code
D. all of these
Answer» E.
35.

Which of the following is material handling equipment?

A. hand truck
B. pulley blocks
C. conveyors
D. all of these
Answer» E.
36.

Which of the following is an objective of quality assurance?

A. to improve quality
B. to reduce cost
C. to increase productivity
D. all of these
Answer» E.
37.

In this sampling plan, the inspection results of two sample sizes are usedto decide whether to accept or reject the complete lot.

A. single sampling plan
B. double sampling plan
C. questionnaire
D. census investigation
Answer» C. questionnaire
38.

Which of the following is a part of cost of quality?

A. prevention cost
B. appraisal cost
C. failure cost
D. all of these
Answer» E.
39.

……………………..starts from some data in the future and schedules therequired operations in reverse sequence

A. scheduling
B. backward scheduling
C. forward scheduling
D. all of these
Answer» C. forward scheduling
40.

……………….is a time table for performing activities utilizing resources orallocating activities

A. scheduling
B. engineering
C. reporting
D. communication
Answer» B. engineering
41.

Which of the following is an objective of scheduling?

A. meet due dates
B. minimise lead time
C. minimise setup time and set up cost
D. all of these
Answer» E.
42.

Which of the following factors affect capacity planning?

A. type of product
B. type of process
C. skill level of workers
D. all of these
Answer» E.
43.

…………………is the process of determining which job to start first and inwhat order other jobs should be processed on the machine or in work centre

A. job sequencing
B. priority rules
C. batch production
D. none of these
Answer» B. priority rules
44.

Which of the following technique is employed for measuring work

A. time study
B. work sampling
C. predetermined motion time studies
D. all of these
Answer» E.
45.

………………….refers to the process of creating new products or modifyingthe existing ones within a predetermined time frame and cost price

A. product design
B. product development
C. market development
D. none of these
Answer» C. market development
46.

……………refers to the development of the concept or idea of a product interms of specifications which are required for transforming the idea in to product

A. product design
B. product development
C. (a) and (b)
D. none of these
Answer» B. product development
47.

…………….is the process of careful step by step of dismantling of existing product in order to understand its unique underlying concepts

A. reverse engineering
B. civil engineering
C. (a) and (b)
D. none of these
Answer» B. civil engineering
48.

Which of the following is a part of product life cycle

A. introduction phase
B. growth phase
C. saturation phase
D. all of these
Answer» E.
49.

Which of the following is incorrect in the case of job production?

A. more variety of products is manufactured as per customer’s requirements.
B. volume of production is large.
C. highly skilled employees are required who can take up each job as a challenge.
D. detailed planning is essential for sequencing the requirements of each product.
Answer» C. highly skilled employees are required who can take up each job as a challenge.
50.

Which of the following is a production system?

A. continuous system
B. intermittent system
C. project systems
D. all of these
Answer» E.