MCQOPTIONS
Saved Bookmarks
| 1. |
A job costing system is usually based on absorption costing principles, and in addition a cost is included for non-production overheads. |
| A. | False |
| B. | True |
| C. | none |
| D. | none |
| Answer» C. none | |