1.

A computer lab having a load of 450 MJ/day is cooled round the clock. It requires an air – conditioning plant of capacity about:

A. 2.75 ton
B. 1.5 ton
C. 2 ton
D. 1.75 ton
Answer» C. 2 ton


Discussion