1.

A can complete a piece of work in 4 days. B takes double the time taken by A, C takes double that of B, and D takes double that of C to complete the same task. They are paired in groups of two each. One pair takes two-thirds the time needed by the second pair to complete the work. Which is the first pair?

A. A, B
B. A, C
C. B, C
D. A, D
Answer» E.


Discussion

No Comment Found