This section includes 11 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
For making bund ordinary mud wall gonda ( bund) about 8” * 6” shall be made on the sides. |
A. | True |
B. | False |
C. | |
Answer» B. False | |
2. |
AVERAGE_NUMBER_OF_BLOCKS_REQUIRED_FOR_A_TWO-ROOMED_HOUSE_IS_ABOUT_2500.?$ |
A. | True |
B. | False |
Answer» B. False | |
3. |
For preparation of subgrade the existing subgrade should be dressed to a camber of 1 in 24 to 1 in 32.$ |
A. | True |
B. | False |
Answer» B. False | |
4. |
Before_applying_water_proof_mud_plaster,_the_joints_should_not_be_scrapped.$ |
A. | True |
B. | False |
Answer» C. | |
5. |
For making bund ordinary mud wall gonda ( bund) about 8” * 6” shall be made on the sides.$ |
A. | True |
B. | False |
Answer» B. False | |
6. |
The roofing cannot be made with slate? |
A. | True |
B. | False |
Answer» C. | |
7. |
Stabilized soil wall is cued for ______ to ______ days by sprinkling water. |
A. | 3 to 6 |
B. | 15 to 20 |
C. | 7 to 10 |
D. | 20 to 35 |
Answer» D. 20 to 35 | |
8. |
The excavation exceeding 1.5 m in width and 10 sq. m in plan area with a depth not exceeding 30 cm, is termed as __________ |
A. | excavation |
B. | surface dressing |
C. | surface excavation |
D. | cutting |
Answer» D. cutting | |
9. |
The brick work is not measured in cu m in case of __________ |
A. | one or more than one brick wall |
B. | brick work in arches |
C. | reinforced brick work |
D. | half brick wall |
Answer» E. | |
10. |
For fourth class building roofing shall be of __________over bamboo and wooden supports. |
A. | mud roof |
B. | tile roof |
C. | wooden roof |
D. | bamboo roof |
Answer» C. wooden roof | |
11. |
The water proof mud- plaster consists of _______________ |
A. | soil |
B. | janta Emulsion |
C. | cowdung |
D. | soil, janta emulsion and cowdung |
Answer» E. | |