

MCQOPTIONS
Saved Bookmarks
This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Calculate the area of the tube settlers for the given data:
|
A. | nSurface loading rate: 7 m<sup>2</sup>/m<sup>3</sup>/h |
B. | t215 m<sup>2</sup> |
C. | t300 m<sup>2</sup> |
D. | t400 m<sup>2</sup> |
E. | t500 m<sup>2</sup> |
Answer» B. t215 m<sup>2</sup> | |
2. |
What is the mathematical representation when many plates are used? |
A. | tV=Q/N<sub>wb</sub> |
B. | tV= Q x N<sub>wb</sub> |
C. | tV= Q/N<sub>w</sub> |
D. | tV=Q x N<sub>w</sub> |
Answer» B. tV= Q x N<sub>wb</sub> | |
3. |
Tube settlers are operated in which mode? |
A. | tConcurrent |
B. | tCountercurrent |
C. | tCross flow |
D. | tHindered settling |
Answer» C. tCross flow | |
4. |
What is the nominal spacing between the plates? |
A. | t1 inch |
B. | t2 inch |
C. | t3 inch |
D. | t4 inch |
Answer» C. t3 inch | |