| 1. | A system of polymers with longer side and shorter side chains is called ____________ | 
| A. | Zero energy system | 
| B. | Elastic energy system | 
| C. | Bonded energy system | 
| D. | Force energy system | 
| Answer» B. Elastic energy system | |
| 2. | Degussa-MBT construction chemicals (INDIA) have developed revolutionary type of admixtures based on? | 
| A. | have developed revolutionary type of admixtures based on?a) Micro science | 
| B. | Nano science | 
| C. | poly science | 
| D. | Animal science | 
| Answer» C. poly science | |
| 3. | The self compacting concrete (SCC) is generally referred as ____________ | 
| A. | Spatial concrete | 
| B. | Pores concrete | 
| C. | Rheodynamic concrete | 
| D. | Flexible concrete | 
| Answer» D. Flexible concrete | |
| 4. | When concrete is deposited in layers it should be allowed to ____________ | 
| A. | Sink | 
| B. | Collapse | 
| C. | Cut | 
| D. | Restrain | 
| Answer» B. Collapse | |
| 5. | When vibrators are used for horizontal and vertical operation, the spacing should ____________ | 
| A. | Overlap | 
| B. | Attached | 
| C. | Hardened | 
| D. | Made wet | 
| Answer» B. Attached | |
| 6. | The vibrations should be used only for ____________ | 
| A. | Densation | 
| B. | Compaction | 
| C. | Rotation | 
| D. | Spinning | 
| Answer» C. Rotation | |
| 7. | Prestressed concrete members should be compacted by which type of vibration? | 
| A. | Mechanical vibration | 
| B. | Structural vibration | 
| C. | Internal vibration | 
| D. | External vibration | 
| Answer» B. Structural vibration | |
| 8. | The floors and girders of through type structures should be placed in ____________ | 
| A. | Two continuous | 
| B. | One continuous | 
| C. | Span continuous | 
| D. | Limit continuous | 
| Answer» C. Span continuous | |
| 9. | Prestressed concrete has more or less replaced ____________ | 
| A. | Reinforced concrete | 
| B. | Prestressed concrete | 
| C. | Aluminium concrete | 
| D. | Voids concrete | 
| Answer» B. Prestressed concrete | |
| 10. | One of the structural forms used for bridges are ____________ | 
| A. | Solid slabs | 
| B. | Dense slabs | 
| C. | Rigid slabs | 
| D. | Open slabs | 
| Answer» B. Dense slabs | |
| 11. | DEGUSSA-MBT_CONSTRUCTION_CHEMICALS_(INDIA)_HAVE_DEVELOPED_REVOLUTIONARY_TYPE_OF_ADMIXTURES_BASED_ON:?$ | 
| A. | Micro science | 
| B. | Nano science | 
| C. | poly science | 
| D. | Animal science | 
| Answer» C. poly science | |
| 12. | A_system_of_polymers_with_longer_side_and_shorter_side_chains_is_called:$ | 
| A. | Zero energy system | 
| B. | Elastic energy system | 
| C. | Bonded energy system | 
| D. | Force energy system | 
| Answer» B. Elastic energy system | |
| 13. | The self compacting concrete (SCC) is generally referred as? | 
| A. | Spatial concrete | 
| B. | Pores concrete | 
| C. | Rheodynamic concrete | 
| D. | Flexible concrete | 
| Answer» D. Flexible concrete | |
| 14. | When concrete is deposited in layers it should be allowed to: | 
| A. | Sink | 
| B. | Collapse | 
| C. | Cut | 
| D. | Restrain | 
| Answer» B. Collapse | |
| 15. | When vibrators are used for horizontal and vertical operation, the spacing should : | 
| A. | Overlap | 
| B. | Attached | 
| C. | Hardened | 
| D. | Made wet | 
| Answer» B. Attached | |
| 16. | The vibrations should be used only for: | 
| A. | Densation | 
| B. | Compaction | 
| C. | Rotation | 
| D. | Spinning | 
| Answer» C. Rotation | |
| 17. | Prestressed concrete members should be compacted by which type of vibration: | 
| A. | Mechanical vibration | 
| B. | Structural vibration | 
| C. | Internal vibration | 
| D. | External vibration | 
| Answer» B. Structural vibration | |
| 18. | The floors and girders of through type structures should be placed in: | 
| A. | Two continuous | 
| B. | One continuous | 
| C. | Span continuous | 
| D. | Limit continuous | 
| Answer» C. Span continuous | |
| 19. | Prestressed concrete has more or less replaced: | 
| A. | Reinforced concrete | 
| B. | Prestressed concrete | 
| C. | Aluminium concrete | 
| D. | Voids concrete | 
| Answer» B. Prestressed concrete | |
| 20. | One of the structural forms used for bridges are: | 
| A. | Solid slabs | 
| B. | Dense slabs | 
| C. | Rigid slabs | 
| D. | Open slabs | 
| Answer» B. Dense slabs | |