Explore topic-wise MCQs in Waste Water Engineering.

This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

Which of the following runoff formula is correct w.r.t. Kuitchling formula?

A. tI = 2567 / (t+20)
B. tI = 2667 / (t+20)
C. tI = 2676 / (t+10)
D. tI =2867 (t+10)
Answer» C. tI = 2676 / (t+10)
2.

In which of the months does the maximum sewage flow occur in India?

A. tMarch
B. tMay
C. tJuly
D. tSeptember
Answer» D. tSeptember
3.

Which year was the SWMM approved?

A. t2000
B. t2002
C. t2005
D. t2008
Answer» D. t2008
4.

When was SWMM developed?

A. t1970
B. t1980
C. t1990
D. t2000
Answer» B. t1980