101. |
Software Configuration Management can be administered in several ways. These include |
A. | a single software configuration management team for the whole organization |
B. | a separate configuration management team for each project |
C. | software configuration management distributed among the project members |
D. | all of the mentioned |
Answer» B. a separate configuration management team for each project | |
102. |
4 COST MONITORING |
A. | baselines |
B. | source code |
C. | data model |
D. | none of the mentioned |
Answer» B. source code | |
103. |
SPMP stands for |
A. | software project manager’s plan |
B. | software project management plan |
C. | software product management plan |
D. | software product manager’s plan |
Answer» C. software product management plan | |
104. |
Which of the following is not a sign that indicates that an information systems project is in jeopardy? |
A. | software people don’t understand their customers needs |
B. | changes are managed poorly |
C. | sponsorship is gained |
D. | users are resistant |
Answer» D. users are resistant | |
105. |
Which activity sits at the core of software requirements analysis? |
A. | problem decomposition |
B. | partitioning |
C. | problem elaboration |
D. | all of the mentioned |
Answer» E. | |
106. |
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams? |
A. | the difficulty of the problem to be solved |
B. | high frustration caused by personal, business, or technological factors that causes friction among team members |
C. | the degree of sociability required for the project |
D. | the rigidity of the delivery date |
Answer» D. the rigidity of the delivery date | |
107. |
Commitments to unrealistic time and resource estimates may result in |
A. | project delay |
B. | poor quality work |
C. | project failure |
D. | all of the mentioned |
Answer» E. | |
108. |
Which software engineering team has no permanent leader? |
A. | controlled decentralized (cd) |
B. | democratic decentralized (dd) |
C. | controlled centralized (cc) |
D. | none of the mentioned |
Answer» C. controlled centralized (cc) | |
109. |
Which of the following is a collection of project coordination technique? |
A. | formal approaches |
B. | formal, interpersonal procedures |
C. | informal, interpersonal procedures |
D. | all of the mentioned |
Answer» E. | |
110. |
Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks? |
A. | controlled decentralized (cd) |
B. | democratic decentralized (dd) |
C. | controlled centralized (cc) |
D. | none of the mentioned |
Answer» B. democratic decentralized (dd) | |
111. |
Which of the following is not an effective project manager trait? |
A. | problem solving |
B. | managerial identity |
C. | influence and team building |
D. | none of the mentioned |
Answer» E. | |
112. |
Which paradigm relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves? |
A. | random paradigm |
B. | open paradigm |
C. | closed paradigm |
D. | synchronous paradigm |
Answer» D. synchronous paradigm | |
113. |
Who interacts with the software once it is released for production use? |
A. | end-users |
B. | client |
C. | project (technical) managers |
D. | senior managers |
Answer» B. client | |
114. |
Which of the following is not an approach to software cost estimation? |
A. | empirical |
B. | heuristic |
C. | analytical |
D. | critical |
Answer» E. | |
115. |
Which paradigm structures a team loosely and depends on individual initiative of the team members? |
A. | random paradigm |
B. | open paradigm |
C. | closed paradigm |
D. | synchronous paradigm |
Answer» E. | |
116. |
Which of the following is a people- intensive activity? |
A. | problem solving |
B. | organization |
C. | motivation |
D. | project management |
Answer» E. | |
117. |
Which of the following paradigm attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm? |
A. | asynchronous paradigm |
B. | open paradigm |
C. | closed paradigm |
D. | synchronous paradigm |
Answer» C. closed paradigm | |
118. |
Who delivers the technical skills that are necessary to engineer a product or an application? |
A. | practitioners |
B. | project managers |
C. | senior managers |
D. | none of the mentioned |
Answer» B. project managers | |
119. |
A software                  provides the framework from which a comprehensive plan for software development can be established. |
A. | people |
B. | product |
C. | process |
D. | none of the mentioned |
Answer» D. none of the mentioned | |
120. |
Who defines the business issues that often have significant influence on the project? |
A. | practitioners |
B. | project managers |
C. | senior managers |
D. | none of the mentioned |
Answer» D. none of the mentioned | |
121. |
Which of the following is not a project manager’s activity? |
A. | project control |
B. | project management |
C. | project planning |
D. | project design |
Answer» E. | |
122. |
PM-CMM stands for |
A. | people management capability maturity model |
B. | process management capability maturity model |
C. | product management capability maturity model |
D. | project management capability maturity model |
Answer» B. process management capability maturity model | |
123. |
2 COLLECTION OF DATA |
A. | people |
B. | product |
C. | popularity |
D. | process |
Answer» D. process | |
124. |
Project management involves the planning, monitoring, and control of the people, process, and events that occur as software evolves from a preliminary concept to an operational implementation. |
A. | true |
B. | false |
Answer» B. false | |
125. |
Synchronization techniques will be necessary to address the various challenges of harmonising. |
A. | false |
B. | true |
Answer» C. | |
126. |
Which will reduce the energy expenditure? |
A. | clustering |
B. | software agents |
C. | synchronization techniques |
D. | cluster, software agent, and synchronization techniques |
Answer» B. software agents | |
127. |
What is the role of communication protocol in IoT? |
A. | smart cities |
B. | cyber physical system |
C. | mac layer issue |
D. | managing energy |
Answer» D. managing energy | |
128. |
Resource management includes |
A. | iot devices |
B. | iot cloud |
C. | iot networks |
D. | iot web |
Answer» C. iot networks | |
129. |
Which of the following is the future application of IoT? |
A. | role of green iot system |
B. | qos in communication |
C. | secure communication |
D. | multimedia communication |
Answer» B. qos in communication | |
130. |
Resource management will elaborate the key aspects of |
A. | industrial management |
B. | energy management |
C. | network management |
D. | information management |
Answer» D. information management | |
131. |
Managing of resources can be done by implementing |
A. | protocols |
B. | algorithms |
C. | networks |
D. | protocols and algorithms |
Answer» E. | |
132. |
What type of networks is interacting under IoT? |
A. | heterogeneous only |
B. | homogeneous only |
C. | both hetero and homogeneous |
D. | neither hetero nor homo |
Answer» B. homogeneous only | |
133. |
In                    the embedded devices and objects working under IoT are resource constrained. |
A. | health |
B. | industry |
C. | home |
D. | information system |
Answer» E. | |
134. |
                   will enable the humans to access, control and manage the operation. |
A. | iot |
B. | bigdata |
C. | network |
D. | communication |
Answer» B. bigdata | |
135. |
What is the popular method of organizing wireless network topologies? |
A. | software |
B. | synchronization |
C. | network |
D. | cluster |
Answer» E. | |
136. |
Which of the following can be referred to as applications of Randomized algorithm? |
A. | quicksort |
B. | min cut |
C. | verifying matrix multiplication |
D. | all of the mentioned |
Answer» E. | |
137. |
Which of the following can be solved in computer science? |
A. | p=bpp problem |
B. | np=co-np problem |
C. | do one way problems exist? |
D. | all of the mentioned |
Answer» E. | |
138. |
Unix sort command uses                    as its sorting technique. |
A. | quick sort |
B. | bucket sort |
C. | radix sort |
D. | merge sort |
Answer» B. bucket sort | |
139. |
Prisonner’s dilemma can be related to the following: |
A. | cooperative behaviour |
B. | graph theory |
C. | both (a) and (b) |
D. | none of the mentioned |
Answer» B. graph theory | |
140. |
Which of the following algorithms are probably correct as well as fast? |
A. | las vegas algorithm |
B. | monte carlo algorithm |
C. | atlantic city algorithm |
D. | all of the mentioned |
Answer» D. all of the mentioned | |
141. |
Which of the following are probalistic algorithms? |
A. | las vegas algorithm |
B. | monte carlo algorithm |
C. | atlantic city algorithm |
D. | all of the mentioned |
Answer» E. | |
142. |
A randomized algorithm uses random bits as input inorder to achieve a                            good performance over all possible choice of random bits. |
A. | worst case |
B. | best case |
C. | average case |
D. | none of the mentioned |
Answer» D. none of the mentioned | |
143. |
The difference between the maximum time available and the actual time needed to perform an activity is known as |
A. | free float |
B. | independent float |
C. | total float |
D. | half float |
Answer» D. half float | |
144. |
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as |
A. | the most likely time estimate |
B. | optimistic time estimate |
C. | pessimistic time estimate |
D. | expected time estimate |
Answer» D. expected time estimate | |
145. |
In a network, a critical path is the time- wise shortest path. |
A. | true |
B. | false |
Answer» C. | |
146. |
The shortest possible time in which an activity can be achieved under ideal circumstances is known as |
A. | pessimistic time estimate |
B. | optimistic time estimate |
C. | expected time estimate |
D. | the most likely time estimate |
Answer» C. expected time estimate | |
147. |
A PERT network is activity-oriented while a CPM network is event-oriented. |
A. | true |
B. | false |
Answer» C. | |
148. |
                   are used to represent activity in a network diagram. |
A. | circles |
B. | squares |
C. | rectangles |
D. | arrows |
Answer» E. | |
149. |
In bar charts, which colour is used to show the actual progress? |
A. | red |
B. | black |
C. | blue |
D. | green |
Answer» E. | |
150. |
The full form of CPM is |
A. | critical path method |
B. | control path method |
C. | critical plan management |
D. | control path management |
Answer» B. control path method | |