

MCQOPTIONS
Saved Bookmarks
1. |
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as |
A. | the most likely time estimate |
B. | optimistic time estimate |
C. | pessimistic time estimate |
D. | expected time estimate |
Answer» D. expected time estimate | |