1.

A generator who initiates a shipment of hazardous waste must certify _________ techniques adopted.

A. Waste minimisation
B. Manifest
C. Analysis
D. NPL
Answer» B. Manifest
2.

Generator is not held responsible for non-submission of ________

A. E-manifest
B. Manifest
C. Manifest to reporter
D. Manifest to transporter
Answer» B. Manifest
3.

For rejected shipments of hazardous waste the generator must _________

A. Sign item 18c
B. Sign item 20
C. Sign either
D. Sign e-copy
Answer» D. Sign e-copy
4.

For shipments of hazardous waste within the United States only by water _______ copies of manifest must be sent.

A. 1
B. 2
C. 3
D. 4
Answer» D. 4
5.

The generator must sign the manifest by ________

A. Hand
B. Digitally
C. Placard
D. Electronically
Answer» B. Digitally
6.

A transporter must keep a copy of each Biennial Report for three years.

A. True
B. False
Answer» C.
7.

______ planning is required for Emergency Procedures while handling SQG waste.

A. Less
B. Basic
C. Full
D. Null
Answer» C. Full
8.

Accumulation time limit for SQG is less than or equal to _______ days.

A. 170
B. 180
C. 190
D. 160
Answer» C. 190
9.

On-Site Accumulation Quantity of small scale generators is less than ______ kg.

A. 2000
B. 4000
C. 6000
D. 8000
Answer» D. 8000
10.

EPA ID is required for very small quantity generators.

A. True
B. False
Answer» C.
11.

GENERATOR_IS_NOT_HELD_RESPONSIBLE_FOR_NON-SUBMISSION_OF_____?$

A. E-manifest
B. Manifest
C. Manifest to reporter
D. Manifest to transporter
Answer» B. Manifest
12.

FOR_REJECTED_SHIPMENTS_OF_HAZARDOUS_WASTE_THE_GENERATOR_MUST______?$

A. Sign item 18c
B. Sign item 20
C. Sign either
D. Sign e-copy
Answer» D. Sign e-copy
13.

A generator who initiates a shipment of hazardous waste must certify _____ techniques adopted.$

A. Waste minimisation
B. Manifest
C. Analysis
D. NPL
Answer» B. Manifest
14.

For shipments of hazardous waste within the United States only by water ____ copies of manifest must be sent?

A. 1
B. 2
C. 3
D. 4
Answer» D. 4
15.

The generator must sign the manifest by ____

A. Hand
B. Digitally
C. Placard
D. Electronically
Answer» B. Digitally
16.

A transporter must keep a copy of each Biennial Report for three years. True or False.

A. True
B. False
Answer» C.
17.

A generator must keep a copy of each manifest signed for a period of _____ years.

A. 1
B. 2
C. 3
D. 4
Answer» D. 4
18.

_____ planning is required for Emergency Procedures while handling SQG waste.

A. Less
B. Basic
C. Full
D. Null
Answer» C. Full
19.

Accumulation time limit for SQG is less than or equal to ____ days.

A. 170
B. 180
C. 190
D. 160
Answer» C. 190
20.

On-Site Accumulation Quantity of small scale generators is less than ____ kg.

A. 2000
B. 4000
C. 6000
D. 8000
Answer» D. 8000
21.

EPA ID is required for very small quantity generators. True or False.

A. True
B. False
Answer» C.