1.

Lead content has to be checked in ground water analysis.

A. True
B. False
Answer» B. False
2.

The directions of the ground water flow have to be established with _________

A. State Ground Water Board
B. Water Control Board
C. PCB
D. SPCB
Answer» B. Water Control Board
3.

The ground water flow direction has to be ascertained periodically and reported at least __________

A. Once in a year
B. Once in two years
C. Once in three years
D. Once in four years
Answer» D. Once in four years
4.

If no open wells are available, action needs to be taken to provide at least _________ monitoring wells.

A. 1
B. 2
C. 3
D. 4
Answer» E.
5.

Ground water samples should be collected at least up to a distance ________ km.

A. 2
B. 3
C. 4
D. 5
Answer» E.
6.

Ground water pH has to be analysed in monitoring.

A. True
B. False
Answer» B. False
7.

Ground water characteristics has to be monitored at least once in a _________ till design span.

A. Week
B. Month
C. Day
D. Quarter
Answer» E.
8.

Lead content has to be checked in ground water analysis. True or False?

A. True
B. False
Answer» B. False
9.

The directions of the ground water flow have to be established with ____

A. State Ground Water Board
B. Water Control Board
C. PCB
D. SPCB
Answer» B. Water Control Board
10.

The ground water flow direction has to be ascertained periodically and reported at least _____

A. Once in a year
B. Once in two years
C. Once in three years
D. Once in four years
Answer» D. Once in four years
11.

How should the monitoring wells be arranged in the absence of bore wells?

A. One on up gradient and other three on the down gradient
B. One on up gradient and other two on the down gradient
C. One on up gradient and other one on the down gradient
D. One on up gradient and other four on the down gradient
Answer» B. One on up gradient and other two on the down gradient
12.

If no open wells are available, action needs to be taken to provide at least ____ monitoring wells.

A. 1
B. 2
C. 3
D. 4
Answer» E.
13.

Ground water samples should be collected at least up to a distance ___ km.

A. 2
B. 3
C. 4
D. 5
Answer» E.
14.

Ground water pH has to be analysed in monitoring. True or False.

A. True
B. False
Answer» B. False
15.

Ground water characteristics has to be monitored at least once in a ____ till design span.

A. Week
B. Month
C. Day
D. Quarter