1.
Accumulation time limit for SQG is less than or equal to _______ days.
A.
170
B.
180
C.
190
D.
160
Answer» C. 190
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
A generator who initiates a shipment of hazardous waste must certify _________ techniques adopted.
Generator is not held responsible for non-submission of ________
For rejected shipments of hazardous waste the generator must _________
For shipments of hazardous waste within the United States only by water _______ copies of manifest must be sent.
The generator must sign the manifest by ________
A transporter must keep a copy of each Biennial Report for three years.
______ planning is required for Emergency Procedures while handling SQG waste.
Accumulation time limit for SQG is less than or equal to _______ days.
On-Site Accumulation Quantity of small scale generators is less than ______ kg.
EPA ID is required for very small quantity generators.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply