1. |
Which of the below is not a type of test performed on coarse aggregates in the rigid pavement for quality control? |
A. | Alkali-aggregate reaction |
B. | Los Angeles abrasion |
C. | Chemical test |
D. | Soundness |
Answer» D. Soundness | |
2. |
The quality control test for the rate of spread of binder is done based on IS 2386-1963. |
A. | True |
B. | False |
Answer» C. | |
3. |
What are the main parameters to be tested for ensuring quality in the earthwork? |
A. | Borrow materials and compaction |
B. | Moisture content and compaction |
C. | Material properties and depth of earthwork |
D. | Density and deleterious materials |
Answer» B. Moisture content and compaction | |
4. |
Who is responsible for the decision to be taken on the end result method of quality control? |
A. | Designer |
B. | Government |
C. | Chief engineer |
D. | Construction agency |
Answer» E. | |
5. |
______ is an example of the end result method of quality control. |
A. | Slump |
B. | Unevenness |
C. | Soil compaction |
D. | Concreting |
Answer» C. Soil compaction | |
6. |
What are the different types of quality control? |
A. | Process control and target control |
B. | Operation control and target control |
C. | Process control and end result control |
D. | Operation control and end result control |
Answer» D. Operation control and end result control | |
7. |
Which code is referred to for the guidelines regarding quality control? |
A. | IRC:SP:12-2015 |
B. | IRC:SP:11-1984 |
C. | IRC:SP:12-1984 |
D. | IRC:SP:11-2015 |
Answer» C. IRC:SP:12-1984 | |
8. |
What are the key components of quality control? |
A. | Target and strategy |
B. | Target and variability |
C. | Strategy and result |
D. | Result and variability |
Answer» C. Strategy and result | |