This section includes 17 Mcqs, each offering curated multiple-choice questions to sharpen your Manufacturing Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs.30. The break even quantity between the two alternatives is |
A. | 25 |
B. | 50 |
C. | 75 |
D. | 100 |
Answer» C. 75 | |
2. |
For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be |
A. | 300 |
B. | 40 |
C. | 500 |
D. | 1000 |
Answer» D. 1000 | |
3. |
M.T.M is used to |
A. | improve existing methods |
B. | establish time standards |
C. | develop effective methods in advance of the beginning of production |
D. | all of the mentioned |
Answer» E. | |
4. |
P.M.T.S( Predetermined Motion Time System) include |
A. | M.T.M (Method Time Measurement) |
B. | W.F.S (Work Factor Systems) |
C. | B.M.T.S (Basic Motion Time Study) |
D. | All of the mentioned |
Answer» E. | |
5. |
MRP-II system is called a closed loop system because it considers |
A. | inventory |
B. | finance |
C. | man power |
D. | none of the mentioned |
Answer» C. man power | |
6. |
M.T.M_IS_USED_TO?$ |
A. | improve existing methods |
B. | establish time standards |
C. | develop effective methods in advance of the beginning of production |
D. | all of the mentioned |
Answer» E. | |
7. |
Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs.30. The break even quantity between the two alternatives is$ |
A. | 25 |
B. | 50 |
C. | 75 |
D. | 100 |
Answer» C. 75 | |
8. |
For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be$ |
A. | 300 |
B. | 40 |
C. | 500 |
D. | 1000 |
Answer» D. 1000 | |
9. |
P.M.T.S( Predetermined Motion Time System) includ? |
A. | M.T.M (Method Time Measurement) |
B. | W.F.S (Work Factor Systems) |
C. | B.M.T.S (Basic Motion Time Study) |
D. | All of the mentioned |
Answer» E. | |
10. |
MRP-II system is called a closed loop system because it consider? |
A. | inventory |
B. | finance |
C. | man power |
D. | none of the mentioned |
Answer» C. man power | |
11. |
Capacity planning is concerned with |
A. | how many machines required |
B. | how much labour required |
C. | all of the mentioned |
D. | none of the mentioned |
Answer» D. none of the mentioned | |
12. |
CRP takes material requirements from MRP and converts to |
A. | standard hours of man power |
B. | standard hours of machine |
C. | standard hours of load |
D. | all of the mentioned |
Answer» E. | |
13. |
Forecasting is used for |
A. | dependent demand items |
B. | independent demand items |
C. | all of the mentioned |
D. | none of the mentioned |
Answer» C. all of the mentioned | |
14. |
Just in time manufacturing philosophy emphasizes on |
A. | man power |
B. | manufacturing |
C. | profit |
D. | inventory |
Answer» E. | |
15. |
Bill of material structure is used to |
A. | calculate net requirements |
B. | calculate due dates |
C. | calculate man power requirements |
D. | all of the mentioned |
Answer» B. calculate due dates | |
16. |
Inventory record file gives the following information |
A. | lot size |
B. | machine details |
C. | customer name |
D. | none of the mentioned |
Answer» B. machine details | |
17. |
The basic difference between MRP and MRP-II is: |
A. | inventory |
B. | bom |
C. | finance |
D. | capacity planning |
Answer» D. capacity planning | |