1.

P.M.T.S( Predetermined Motion Time System) include

A. M.T.M (Method Time Measurement)
B. W.F.S (Work Factor Systems)
C. B.M.T.S (Basic Motion Time Study)
D. All of the mentioned
Answer» E.


Discussion

No Comment Found