

MCQOPTIONS
Saved Bookmarks
1. |
P.M.T.S( Predetermined Motion Time System) include |
A. | M.T.M (Method Time Measurement) |
B. | W.F.S (Work Factor Systems) |
C. | B.M.T.S (Basic Motion Time Study) |
D. | All of the mentioned |
Answer» E. | |