1.

A project is typically defined in terms of scope, time, cost and which other parameter?

A. Benefits.
B. Quality.
C. Tolerance.
D. Controls.
Answer» C. Tolerance.
2.

The basic nature of a project is a/an _____ one.

A. permanent
B. temporary
C. (A) or (B)
D. Both (A) and (B)
Answer» C. (A) or (B)
3.

____________are avoided by providing more tangible and objective results troughout the life cycle.

A. Adversarial stakeholder relationship
B. Documents
C. Preview
D. risk resolution
Answer» B. Documents
4.

successful projects recognize the continuous improvment towards the best value rather than adhering to__________.

A. Ambiguous statements
B. Software quality
C. Software testing
D. Small scale projects
Answer» B. Software quality
5.

Following is(are) the responsibility(ies) of the project manager.

A. Budgeting and cost control
B. Allocating resources
C. Tracking project expenditure
D. All of the above
Answer» E.
6.

Projects management is divided in _____ process groups.

A. 5
B. 7
C. 9
D. 11
Answer» B. 7
7.

Which model is used during early stages of the system design after the requirements have been established?

A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
Answer» B. A post-architecture model
8.

Usually assets which are financed with the Term Loan provide as a prime security against the Term Loan

A. True
B. False
C. none
D. none
Answer» B. False
9.

Debt restructuring and infusion of external funds for sick units is one of the remedial measures to overcome Industrial Sickness.

A. True
B. False
C. none
D. none
Answer» B. False
10.

According to Olivier Mesly, the 4 P s critical for the success of a project are:

A. plan, processes, people, policy
B. plan, processes, people, power
C. plan, processes, potential, policy
D. plan, processes, potential, power
Answer» C. plan, processes, potential, policy
11.

Project performance consists of

A. Time
B. Cost
C. Quality
D. All of the above
Answer» E.
12.

During feasibility analysis it is necessary to examine several alternative solutions because(i) a comparison of alternatives will lead to a cost-effective solution(ii) a pre-conceived single solution may turn out to be unimplementable(iii) it is always good to examine alternatives(iv) management normally looks at alternatives

A. i and iii
B. i and iv
C. i and ii
D. ii and iv
Answer» D. ii and iv
13.

Which technique is applicable when other projects in the same analogy application domain have been completed?

A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson s Law
Answer» D. Parkinson s Law
14.

The phases of a project life cycle are:

A. starting, planning, control and closing.
B. concept, definition, development, handover and closure.
C. initiation, definition, planning, monitoring and operations.
D. concept, definition, implementation and operations.
Answer» C. initiation, definition, planning, monitoring and operations.
15.

Design phase consist of

A. Input received
B. Output received
C. Both (A) and (B)
D. None of the above
Answer» D. None of the above
16.

The following are the most important points of a detailed system proposal(i) who will supply and install the required equipment(ii) cost-benefit analysis(iii) comparison of alternative solutions(iv) implementation plan

A. i, ii and iii
B. i, iii and iv
C. ii, iii and iv
D. ii and iii
Answer» D. ii and iii
17.

When a company has been financed by consortium of banks, who has to report to BIFR about the sickness?

A. Lead Bank
B. Participating Banks
C. Company
D. None of the Above
Answer» B. Participating Banks
18.

_______milestones occure at the end of the elaboration phase.

A. Life-style architecture
B. Critical
C. Software
D. Schedule
Answer» B. Critical
19.

_________is the critical factor in understanding how to plan and execute a software development project.

A. Process flexibility
B. Architecture
C. Risk resolution
D. Domain experience
Answer» E.
20.

To judge adequacy of market during Preliminary Screening which of the following is a factor to be examined?

A. Total present domestic market
B. Price
C. Product features
D. Quality of the product
Answer» B. Price
21.

The review of the successes and the mistakes is normally held during _____ phase.

A. initiation
B. planning
C. execution
D. closure
Answer» E.
22.

Project risk management is best described as:

A. managing responses to threats.
B. identifying and acknowledging threats and opportunities.
C. planning responses to threats.
D. minimising threats and maximising opportunities.
Answer» E.
23.

The major deficiencies characterizing the labour markets in developing countries like India are

A. Shortage of well trained people
B. Rigid labour laws
C. Both a and b
D. None of the Above
Answer» D. None of the Above
24.

A communication management plan identifies the relevant information that should be communicated to:

A. the project team.
B. the project stakeholders.
C. the project board.
D. the project sponsor.
Answer» C. the project board.
25.

The team is responsible for exchange of information and process guidence either to or from project practitioners.

A. Software engineering process authority.
B. Software engineering environment
C. Project administration
D. Project review
Answer» B. Software engineering environment
26.

The liabilities side of the balance sheet shows the sources of finance employed by the business.

A. True
B. False
C. none
D. none
Answer» B. False
27.

A _________ is developed using historical cost information that relates some software metric to the project cost.

A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson s Law
Answer» B. Expert judgement
28.

The strategy used to correct resource over-allocations by balancing demand for resources and the available supply is known as

A. resource assignment
B. resource leveling
C. resource splitting
D. resource scheduling
Answer» C. resource splitting
29.

Assembling project team and assigning their responsibilities are done during which phase of a project management?

A. Initiation
B. Planning
C. Execution
D. Closure
Answer» B. Planning
30.

Which of the factors should be considered for acceptable risk level at preliminary screening level?

A. Vulnerability to business cycles
B. Technological Changes
C. Competition from imports
D. All of the Above
Answer» E.
31.

How the project work will be carried out, monitored, and controlled? These questions are answered in which phase of the project management?

A. Initiating
B. Planning
C. Executing
D. Closing
Answer» C. Executing
32.

Which one of the following is NOT one of the principle sources which cause uncertainties and error in demand forecasting?

A. Data about Past and Present Market
B. Methods of Forecasting
C. Environmental Changes
D. Government Policies
Answer» E.
33.

Which of the following is not one of the driving forces behind the increasing demand for Project Management?

A. Compression of Product Life Cycle
B. Knowledge Explosion
C. More Emphasis on the Product and Less on the Customer
D. Corporate Downsizing
Answer» D. Corporate Downsizing