This section includes 165 Mcqs, each offering curated multiple-choice questions to sharpen your Mechanical Engineering Questions knowledge and support exam preparation. Choose a topic below to get started.
151. |
Basic tool in work study is __________________? |
A. | graph paper |
B. | process chart |
C. | planning chart |
D. | stop watch |
E. | analytical mind |
Answer» E. analytical mind | |
152. |
Basic motion time study gives times for basic motions in ten thousandths of_______________? |
A. | second |
B. | minute |
C. | hour |
D. | day |
E. | none of the above |
Answer» C. hour | |
153. |
Bar charts are suitable for_____________________? |
A. | minor works |
B. | major works |
C. | large projects |
D. | all of the above |
E. | none of the above |
Answer» B. major works | |
154. |
An optimum project schedule implies_______________? |
A. | optimum utilization of men, machines and materials |
B. | lowest possible cost and shortest possible time for project |
C. | timely execution of project |
D. | to produce best results under given constraints |
E. | realistic execution time, minimum cost and maximum profits |
Answer» C. timely execution of project | |
155. |
An event is indicated on the network by_________________? |
A. | a straight line |
B. | a number enclosed in a circle or a square |
C. | a straight line with circles at the ends |
D. | a dotted line |
E. | an arrow |
Answer» C. a straight line with circles at the ends | |
156. |
Activity s,lack or float of any event on a PERT/CPM chart is represented by__________________? |
A. | latest start time of succeeding event -earliest finish time of preceding event activity time |
B. | latest start time of the event – earliest start time of the event |
C. | latest finish time of event – earliest finish time of the event |
D. | anyone of the above |
E. | none of the above |
Answer» E. none of the above | |
157. |
According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________? |
A. | HA |
B. | HA + (S~A) HA |
C. | HA + ^^-H |
D. | HA + ^^-H |
E. | HA + ^^-HA |
Answer» C. HA + ^^-H | |
158. |
According to MAPI formula, the old machine should be replaced by new one when_____________? |
A. | CAM < DAM |
B. | CAM > DAM |
C. | CAM = DAM |
D. | there is no such criterion |
E. | none of the above |
Answer» B. CAM > DAM | |
159. |
Acceptance sampling is widely used in________________? |
A. | batch production |
B. | job production |
C. | mass production |
D. | all of the above |
E. | none of the above |
Answer» D. all of the above | |
160. |
ABC analysis deals with_________________? |
A. | analysis of process chart |
B. | flow of material |
C. | ordering schedule of job |
D. | controlling inventory costs money |
E. | all of the above |
Answer» E. all of the above | |
161. |
A milestone chart_______________________? |
A. | shows the inter dependences of various jobs |
B. | depicts the delay of jobs, if any |
C. | points outgoing ahead of schedule of jobs, if any |
D. | all of the above |
E. | none of the above |
Answer» F. | |
162. |
A low unit cost can be obtained by following____________________? |
A. | product layout |
B. | functional layout |
C. | automatic material handling equipment |
D. | specialisation of operation |
E. | minimum travel time plan and com¬pact layout |
Answer» B. functional layout | |
163. |
A dummy activity________________? |
A. | is artificially introduced |
B. | is represented by a dotted line |
C. | does not require any time |
D. | all of the above |
E. | none of the above |
Answer» E. none of the above | |
164. |
A CPM family includes____________________? |
A. | CPA (Critical Path Analysis) |
B. | CPP (Critical Path Plotted) |
C. | MCE (Minimum Cost Expenditure) |
D. | CPS (Critical Path Scheduling) |
E. | all of the above |
Answer» F. | |
165. |
A big advantage of PERT over Gantt charts is that in the former case_________________? |
A. | activities and events are clearly shown |
B. | early start and late finish of an activity are clearly marked |
C. | activity times are clear |
D. | critical path can be easily determined |
E. | inter-relationship among activities is clearly shown |
Answer» F. | |