101.

A stockist wishes to optimize the number of perishable items he needs to stock in any month in his store. The demand distribution for this perishable item is:Demand (in units)2345Probability0.100.350.350.20The stockist pays Rs.70 for each item and he sells each at Rs.90. If the stock is left unsold in any month, he can sell the item at Rs.50 each. There is no penalty for unfulfilled demand. To maximize the expected profit, the optimal stock level is:

A. 5 units
B. 4 units
C. 3 units
D. 2 units
Answer» C. 3 units
102.

For a product the forecast and actual sales for December 2002 were 25 and 20 respectively. If the exponential smoothing constant is taken as 0.2, then forecast sale for January 2003 would be

A. 21
B. 23
C. 24
D. 27
Answer» D. 27
103.

A company has an annual demand of 1000 units, ordering cost of Rs. 100/order and carrying cost of Rs. 100/unit/year. If the stock out costs are estimated to be nearly Rs. 400 each time the company runs out of stock, the safety stock justified by the carrying cost will be

A. 4
B. 10
C. 40
D. 100
Answer» C. 40
104.

An organization has decided to produce a new product. Fixed cost for producing the product is estimated as Rs. 1,00,000. Variable cost for producing the product is Rs. 100. Market survey indicated that the product selling price could be Rs. 200. The break-even quantity is

A. 1000
B. 2000
C. 500
D. 900
Answer» B. 2000
105.

A decision making process to determine when a job is to be started in a machine and when it is to be completed is

A. Scheduling
B. Routing
C. Master scheduling
D. Aggregate planning
Answer» B. Routing
106.

Gantt chart is applicable for

A. Time study
B. Motion study
C. Sales forecasting
D. Production scheduling
Answer» E.
107.

ABC analysis, as an input, requires

A. Annual usage and cost of the items
B. Cost and criticality of the items
C. Criticality and availability of the items
D. Availability and annual usage of items
Answer» B. Cost and criticality of the items
108.

Productivity can be improved by

A. Increasing inputs for constant outputs
B. Decreasing outputs for constant inputs
C. Increasing inputs and outputs both in same proportion
D. Decreasing inputs for constant outputs
Answer» E.
109.

In a time study the observed time is 0.75 min, performance rating factor is 110% and allowances are 20% of the normal time. The standard time is

A. 0.82 min
B. 0.975 min
C. 0.99 min
D. 1.03 min
Answer» D. 1.03 min
110.

Materials requirement planning is driven by

A. master production schedule
B. total quality measurement
C. overall production planning
D. overall inventory planning
Answer» B. total quality measurement
111.

Gantt chart is a type of chart which illustrates the-

A. Assignable causes of variation in a process
B. Inventory status and materials requirement
C. Project schedule
D. Common causes of variation in a process
Answer» D. Common causes of variation in a process
112.

___________ is also called line layout.

A. Process layout
B. Functional layout
C. Product layout
D. Fixed position layout
Answer» D. Fixed position layout