Explore topic-wise MCQs in Waste Water Engineering.

This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

How much is the water seal in intercepting trap?

A. t50 mm
B. t100 mm
C. t150 mm
D. t200 mm
Answer» C. t150 mm
2.

At the last main hole of building sewerage, __________ is provided.

A. tGrease trap
B. tGully trap
C. tIntercepting trap
D. tNahini trap
Answer» D. tNahini trap
3.

What is the minimum depth of water seal in floor trap?

A. t25 mm
B. t50 mm
C. t75 mm
D. t100 mm
Answer» C. t75 mm
4.

______ is provided on the floor to collect wastewater from various sources like sinks.

A. tNahini trap
B. tIntercepting trap
C. tS. trap
D. tP. trap
Answer» B. tIntercepting trap