This section includes 3 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which of the following is considered if sewers are placed on the softer grounds? |
A. | tThe trench is excavated to confirm the shape of the pipe |
B. | tSewers are laid embedded in the concrete |
C. | tThe width of the trench is kept to 15 cm |
D. | tThe desired slope is considered |
Answer» C. tThe width of the trench is kept to 15 cm | |
2. |
The depth in open drain should preferably be kept _______ the man height. |
A. | tLess than |
B. | tGreater than |
C. | tEqual to |
D. | tSufficient to |
Answer» B. tGreater than | |
3. |
Storm water is collected from streets into the __________ which in turn discharged into main drains of open type. |
A. | tLink drains |
B. | tLateral drains |
C. | tSub mains |
D. | tInterseptal mains |
Answer» B. tLateral drains | |