1. |
A gap of 0.3m is to maintained between cement bag and wall, while storing cement. |
A. | True |
B. | False |
Answer» B. False | |
2. |
Steam curing is adopted for: |
A. | Precast structures |
B. | Columns |
C. | Beams |
D. | Walls |
Answer» B. Columns | |
3. |
Excess vibration during compacting can lead to: |
A. | Bleeding |
B. | Segregation |
C. | High strength |
D. | Air bubbles |
Answer» C. High strength | |
4. |
Which is the best method for curing flat surfaces? |
A. | Spraying water |
B. | Placing wet gunny bags |
C. | Applying curing compounds |
D. | Stagnating water |
Answer» E. | |
5. |
Concrete is generally placed on a: |
A. | Form work |
B. | Stand |
C. | Mould |
D. | Platform |
Answer» B. Stand | |
6. |
WHICH_IS_THE_BEST_METHOD_FOR_CURING_FLAT_SURFACES??$ |
A. | Spraying water |
B. | Placing wet gunny bags |
C. | Applying curing compounds |
D. | Stagnating water |
Answer» E. | |
7. |
Steam curing is adopted for:$ |
A. | Precast structures |
B. | Columns |
C. | Beams |
D. | Walls |
Answer» B. Columns | |
8. |
Excess_vibration_during_compacting_can_lead_to:$ |
A. | Bleeding |
B. | Segregation |
C. | High strength |
D. | Air bubbles |
Answer» C. High strength | |
9. |
A_gap_of_0.3m_is_to_maintained_between_cement_bag_and_wall,_while_storing_cement. |
A. | True |
B. | False |
Answer» B. False | |
10. |
Concrete is generally placed on a? |
A. | Form work |
B. | Stand |
C. | Mould |
D. | Platform |
Answer» B. Stand | |
11. |
Compacting is done to: |
A. | Place concrete on flat surface |
B. | Remove air bubbles |
C. | Place concrete on sloping surface |
D. | Introduce air bubbles |
Answer» C. Place concrete on sloping surface | |
12. |
In small works, concrete is transported using: |
A. | Conveyer belts |
B. | Pumps |
C. | Pans |
D. | Buckets |
Answer» D. Buckets | |
13. |
How many types of machine mixers are available? |
A. | 2 |
B. | 5 |
C. | 6 |
D. | 3 |
Answer» E. | |
14. |
What is the maximum height through which concrete can be poured? |
A. | 0.1-0.6 m |
B. | 0.8-1 m |
C. | 0.5 m |
D. | 2 m |
Answer» C. 0.5 m | |
15. |
How many methods of batching are there? |
A. | 2 |
B. | 3 |
C. | 5 |
D. | 6 |
Answer» B. 3 | |
16. |
Ready mix plant and central mix plant differ in: |
A. | Transportation |
B. | Setting time |
C. | Properties |
D. | Water addition |
Answer» E. | |
17. |
Which process comes after batching in manufacture process? |
A. | Transportation |
B. | Placing |
C. | Mixing |
D. | Compacting |
Answer» D. Compacting | |