MCQOPTIONS
Saved Bookmarks
This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
WHICH_OF_THE_FOLLOWING_IS_NOT_BASED_ON_DEMING‚ÄÖ√Ñ√∂‚ÀÖ√Ë‚ÀÖ¬•S_POINTS??$# |
| A. | Focus on continuous improvement |
| B. | An ongoing program of education of employees is necessary. |
| C. | Reach the slogans and numerical goals for the workplace |
| D. | Elimination of numerical quotas and work standards |
| Answer» D. Elimination of numerical quotas and work standards | |
| 2. |
Which of these is not the part of Deming’s 7 diseases of Management?$# |
| A. | Lack of constancy of purpose |
| B. | Emphasis on short-term profits |
| C. | Emphasis on Long term profits |
| D. | Mobility of top management |
| Answer» D. Mobility of top management | |
| 3. |
How_many_points_did_Deming_give_to_elaborate_methods_for_quality_improvement?$ |
| A. | 10 |
| B. | 12 |
| C. | 23 |
| D. | 14 |
| Answer» E. | |
| 4. |
PDCA cycle is also termed as PDSA cycle. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 5. |
Lack of constancy of purpose means ________ |
| A. | low short term profits |
| B. | low long term profits |
| C. | inferior strategically planning about the continuous improvement |
| D. | lack of investment planning |
| Answer» D. lack of investment planning | |
| 6. |
‚Äö√Ñ√∂‚àö√ë‚àö‚à´We can rely on mass inspection to control quality.‚Äö√Ñ√∂‚àö√ë‚àöœ?# |
| A. | True |
| B. | False |
| Answer» C. | |
| 7. |
Quality assurance is related to _____ |
| A. | strategic activities to ensure the financial plans |
| B. | set of activities that ensures that the services and product meet the requirements |
| C. | set of activities that ensures that the supplier-customer quality issues are properly resolved |
| D. | set of activities that include inspection and planning |
| Answer» D. set of activities that include inspection and planning | |
| 8. |
The highest reduction in the variability from one unit of product to other can be obtained by ______ |
| A. | statistical process control |
| B. | acceptance Sampling |
| C. | design of Experiments |
| D. | design of Experiments with automatic control |
| Answer» E. | |
| 9. |
Which of these is not a part of feedback control? |
| A. | Engineering control |
| B. | Automatic control |
| C. | Acceptance sampling |
| D. | Routine adjustment |
| Answer» D. Routine adjustment | |
| 10. |
Control chart is a useful ______ |
| A. | manufacturing process |
| B. | process monitoring technique |
| C. | off-line quality control tool |
| D. | part of acceptance sampling techniques |
| Answer» C. off-line quality control tool | |
| 11. |
Factorial design is a _______ |
| A. | off-line quality control tool |
| B. | on-Line quality control tool |
| C. | in-process procedure |
| D. | redundancy plan |
| Answer» B. on-Line quality control tool | |
| 12. |
In the Factorial design type of design of experiments, which of these points are used? |
| A. | Controlling noise factors |
| B. | Outgoing inspection |
| C. | Incoming inspection |
| D. | Testing outputs of all possible combination of factor levels |
| Answer» E. | |
| 13. |
In the low level of maturity of any organization, the technique of quality improvement that is used the most is _________ |
| A. | acceptance sampling |
| B. | statistical process control |
| C. | design of experiments |
| D. | regression analysis |
| Answer» B. statistical process control | |