

MCQOPTIONS
Saved Bookmarks
This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Pavement Design knowledge and support exam preparation. Choose a topic below to get started.
1. |
What is the cement : sand ratio used for the grouting in mud jacking method? |
A. | 1:1.5 |
B. | 1:3 |
C. | 1:3.5 |
D. | 1:2 |
Answer» D. 1:2 | |
2. |
The defect of bleeding in flexible pavements is a major cause for skidding. |
A. | True |
B. | False |
Answer» B. False | |
3. |
What condition of the flexible pavement would require a complete reconstruction of the pavement? |
A. | Highly plastic subgrade |
B. | High-temperature variation |
C. | Improper compaction of lower layers |
D. | Instability of underlying layer |
Answer» D. Instability of underlying layer | |
4. |
In the repair of potholes, a ______ portion of the pavement surrounding it is cut out. |
A. | Circular |
B. | Rectangular |
C. | Square |
D. | Irregular |
Answer» C. Square | |
5. |
Which of the below defects in the flexible pavement requires special repair? |
A. | Waves and corrugations |
B. | Bleeding |
C. | Potholes |
D. | Cracks |
Answer» B. Bleeding | |
6. |
What does MMS stand for? |
A. | Maintenance Management Software |
B. | Maintenance Management System |
C. | Maintenance Monitoring Software |
D. | Maintenance Monitoring System |
Answer» C. Maintenance Monitoring Software | |
7. |
Which of the below is not a type of maintenance work carried out on flexible pavements? |
A. | Patch treatment |
B. | Surface treatment |
C. | Resurfacing |
D. | Crack filling |
Answer» E. | |
8. |
What is applied on the cleaned cracks to facilitate proper bonding of the sealant? |
A. | Cement paste |
B. | Mortar |
C. | Kerosene oil |
D. | Paint |
Answer» D. Paint | |
9. |
______ is a special repair done on the rigid pavements. |
A. | Mud jacking |
B. | Mud pumping |
C. | Slab pumping |
D. | Slab jacking |
Answer» B. Mud pumping | |
10. |
Which of the below is not used in the micro-surfacing? |
A. | Water |
B. | Chemical additive |
C. | Cement |
D. | Crushed aggregate |
Answer» D. Crushed aggregate | |
11. |
Which of the below is not a type of field survey to be carried out on the flexible pavement? |
A. | Drainage |
B. | Deflection |
C. | DCP |
D. | Strength |
Answer» E. | |
12. |
PMIS is a type of NDT testing to determine the condition of the pavement. |
A. | True |
B. | False |
Answer» C. | |
13. |
What step is to be done after the preliminary survey of the pavement has been carried out? |
A. | Location for material procurement |
B. | Location for material placement |
C. | Location for material sampling |
D. | Location for material scraping |
Answer» D. Location for material scraping | |
14. |
Which of the below is not an important aspect to be checked before performing the rehabilitation works? |
A. | Investigation of existing pavement condition |
B. | Scraping off the existing pavement surface |
C. | Performance history evaluation |
D. | Lab testing of pavement materials |
Answer» C. Performance history evaluation | |
15. |
Which of the below is not a type of maintenance done on pavements? |
A. | Routine |
B. | Special |
C. | Periodic |
D. | Preventive |
Answer» E. | |