1. |
Process of maintaining different components of building so that it can provide proper service throughout its working life is known as__________ |
A. | Building maintenance |
B. | Building management |
C. | Building service |
D. | Building repairs |
Answer» B. Building management | |
2. |
Mortar or concrete conveyed through pressure hose and applied pneumatically at high velocity on to a surface is called |
A. | guniting |
B. | grouting |
C. | sealing |
D. | spraying |
Answer» B. grouting | |
3. |
Which of the following materials can you use for checking minor leakages through CI pipe joints? |
A. | white lead. |
B. | cement |
C. | lead wool |
D. | grease |
Answer» D. grease | |
4. |
There is seepage of water on both sides of load bearing wall of a building with flat roof. What remedy will you suggest? |
A. | Remove plaster on the wall and replaster with rich mix. |
B. | Inspect the roof for cracks over the wall and seal the crack. |
C. | Paint both the surfaces of the wall with oil paint. |
D. | Plaster both the surface of wall with cement mortar mixed with water proofing compound. |
Answer» C. Paint both the surfaces of the wall with oil paint. | |
5. |
In a brick masonry structure the following defects are noticed during inspection. Which one of them requires immediate maintenance repair? |
A. | Dampness on wall |
B. | Growth of vegetation |
C. | Structure failure by settlement |
D. | Falling of plaster |
Answer» D. Falling of plaster | |
6. |
In restoration of strength by adding external reinforced concrete the damages concrete is first repaired by applying ____________ |
A. | Preload |
B. | Tensile load |
C. | Compressive load |
D. | Overload |
Answer» B. Tensile load | |
7. |
Most suitable method of protecting steel columns of a multistoried building against rusting is to: |
A. | paint with aluminium paint. |
B. | paint with bitumen paint. |
C. | paint with redoxide. |
D. | encase in concrete |
Answer» B. paint with bitumen paint. | |
8. |
Maintaining prestressed concrete structures of various types in a fit and serviceable condition is primary function of ____________ |
A. | Maintenance engineer |
B. | Design engineer |
C. | Surface engineer |
D. | Structural engineer |
Answer» B. Design engineer | |
9. |
Deflection was noticed in a newly constructed properly designed R.C.C.beam. The defect may be due to____________ |
A. | very longs pan. |
B. | diagonal cracks near edge of support |
C. | insufficient concrete cover. |
D. | early removal of form work. |
Answer» E. | |
10. |
Rehabilitation of structures may be required due to several reasons. Choose the correct reason. |
A. | Environmental effects |
B. | Tensile effects |
C. | Compressive effects |
D. | Range effects |
Answer» B. Tensile effects | |
11. |
What is minimum distance between building and road, necessary in the case of push arm technique? |
A. | 5m |
B. | 3m |
C. | 8m |
D. | 10m |
Answer» C. 8m | |
12. |
The high pH of the fresh concrete make a thin oxide film around the reinforcement steel |
A. | true |
B. | false |
C. | none |
D. | all |
Answer» B. false | |
13. |
According to the CPWD guideline, schedule for the annual maintenance work should be complete on or before_______ |
A. | 30th April |
B. | 31st January |
C. | 15th August |
D. | 1st March |
Answer» B. 31st January | |