MCQOPTIONS
Saved Bookmarks
This section includes 19 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The specifications for batching and mixing of concrete are measured to an accuracy of ____________ |
| A. | 0.5% |
| B. | 0.6% |
| C. | 0.8% |
| D. | 0.2% |
| Answer» B. 0.6% | |
| 2. |
There is no single form of design which would always be most? |
| A. | Long lasting |
| B. | Economical |
| C. | Universal |
| D. | Same |
| Answer» C. Universal | |
| 3. |
One of the following elements of super structure is? |
| A. | Aircraft hanger |
| B. | Water vessels |
| C. | Hydrogen container |
| D. | Liquid container |
| Answer» B. Water vessels | |
| 4. |
The pneumatic caisson foundations consisting of ____________ |
| A. | Concrete cutting |
| B. | Steel cutting |
| C. | Aluminium cutting |
| D. | Block cutting |
| Answer» C. Aluminium cutting | |
| 5. |
The precast piles of reinforced concrete are widely used types for ____________ |
| A. | Plastic solids |
| B. | Wet soils |
| C. | Clayey soils |
| D. | Hard soils |
| Answer» D. Hard soils | |
| 6. |
Deep foundation depends upon the type of ____________ |
| A. | Super structure |
| B. | Foundation |
| C. | Span |
| D. | Area |
| Answer» B. Foundation | |
| 7. |
The sub structure in every structure is known as ____________ |
| A. | Beam |
| B. | Foundation |
| C. | Slab |
| D. | Column |
| Answer» C. Slab | |
| 8. |
The architectural capabilities constitutes the essence of the ____________ |
| A. | Conceptual aspects of structures |
| B. | Chemical aspects of structures |
| C. | Structural aspects of structures |
| D. | Time aspects of structures |
| Answer» C. Structural aspects of structures | |
| 9. |
The logical steps to be found before beginning the construction of any prestressed concrete structures are ____________ |
| A. | Planning analysis and design |
| B. | Stress analysis |
| C. | Strain analysis |
| D. | Prestressed analysis |
| Answer» B. Stress analysis | |
| 10. |
THERE_IS_NO_SINGLE_FORM_OF_DESIGN_WHICH_WOULD_ALWAYS_BE_MOST:?$ |
| A. | Long lasting |
| B. | Economical |
| C. | Universal |
| D. | Same |
| Answer» C. Universal | |
| 11. |
The specifications for batching and mixing of concrete are measured to an accuracy of:$ |
| A. | 0.5% |
| B. | 0.6% |
| C. | 0.8% |
| D. | 0.2% |
| Answer» B. 0.6% | |
| 12. |
One of the following elements of super structure? |
| A. | Aircraft hanger |
| B. | Water vessels |
| C. | Hydrogen container |
| D. | Liquid container |
| Answer» B. Water vessels | |
| 13. |
The pneumatic caisson foundations consisting of: |
| A. | Concrete cutting |
| B. | Steel cutting |
| C. | Aluminium cutting |
| D. | Block cutting |
| Answer» C. Aluminium cutting | |
| 14. |
The precast piles of reinforced concrete are widely used types for: |
| A. | Plastic solids |
| B. | Wet soils |
| C. | Clayey soils |
| D. | Hard soils |
| Answer» D. Hard soils | |
| 15. |
Deep foundation depends upon the type of: |
| A. | Super structure |
| B. | Foundation |
| C. | Span |
| D. | Area |
| Answer» B. Foundation | |
| 16. |
The sub structure in every structure is known as: |
| A. | Beam |
| B. | Foundation |
| C. | Slab |
| D. | Column |
| Answer» C. Slab | |
| 17. |
Which type of engineers should be more conceptual and visual? |
| A. | Construction engineers |
| B. | Site engineers |
| C. | Practical engineers |
| D. | Workers |
| Answer» D. Workers | |
| 18. |
The architectural capabilities constitutes the essence of the |
| A. | Conceptual aspects of structures |
| B. | Chemical aspects of structures |
| C. | Structural aspects of structures |
| D. | Time aspects of structures |
| Answer» C. Structural aspects of structures | |
| 19. |
The logical steps to be found before beginning the construction of any prestressed concrete structures are: |
| A. | Planning analysis and design |
| B. | Stress analysis |
| C. | Strain analysis |
| D. | Prestressed analysis |
| Answer» B. Stress analysis | |