Explore topic-wise MCQs in Pavement Design.

This section includes 8 Mcqs, each offering curated multiple-choice questions to sharpen your Pavement Design knowledge and support exam preparation. Choose a topic below to get started.

1.

Which of the below is not a type of test performed on coarse aggregates in the rigid pavement for quality control?

A. Alkali-aggregate reaction
B. Los Angeles abrasion
C. Chemical test
D. Soundness
Answer» D. Soundness
2.

The quality control test for the rate of spread of binder is done based on IS 2386-1963.

A. True
B. False
Answer» C.
3.

What are the main parameters to be tested for ensuring quality in the earthwork?

A. Borrow materials and compaction
B. Moisture content and compaction
C. Material properties and depth of earthwork
D. Density and deleterious materials
Answer» B. Moisture content and compaction
4.

Who is responsible for the decision to be taken on the end result method of quality control?

A. Designer
B. Government
C. Chief engineer
D. Construction agency
Answer» E.
5.

______ is an example of the end result method of quality control.

A. Slump
B. Unevenness
C. Soil compaction
D. Concreting
Answer» C. Soil compaction
6.

What are the different types of quality control?

A. Process control and target control
B. Operation control and target control
C. Process control and end result control
D. Operation control and end result control
Answer» D. Operation control and end result control
7.

Which code is referred to for the guidelines regarding quality control?

A. IRC:SP:12-2015
B. IRC:SP:11-1984
C. IRC:SP:12-1984
D. IRC:SP:11-2015
Answer» C. IRC:SP:12-1984
8.

What are the key components of quality control?

A. Target and strategy
B. Target and variability
C. Strategy and result
D. Result and variability
Answer» C. Strategy and result