MCQOPTIONS
Saved Bookmarks
This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Pumping be not used in case of concreting works. |
A. | True |
B. | False |
Answer» B. False | |
2. |
In order to make a elastomeric bearing act/ function as a soft spring it should be made to allow it to bulge laterally and also the stiffness compression can be increased by simply increasing the limiting amount of the lateral bulging. |
A. | True |
B. | False |
Answer» B. False | |
3. |
Curing is the process of maintaining the moisture and temperature conditions for freshly deployed concrete. |
A. | True |
B. | False |
Answer» B. False | |
4. |
A projecting piece usually provided to support a truss is __________ |
A. | coping |
B. | cornice |
C. | lintal |
D. | frieze |
Answer» E. | |
5. |
____________ is a type of slump test indication. |
A. | Shear slump |
B. | Moment slump |
C. | False slump |
D. | Rigid sump |
Answer» B. Moment slump | |
6. |
IN_ORDER_TO_MAKE_A_ELASTOMERIC_BEARING_ACT/_FUNCTION_AS_A_SOFT_SPRING_IT_SHOULD_BE_MADE_TO_ALLOW_IT_TO_BULGE_LATERALLY_AND_ALSO_THE_STIFFNESS_COMPRESSION_CAN_BE_INCREASED_BY_SIMPLY_INCREASING_THE_LIMITING_AMOUNT_OF_THE_LATERAL_BULGING.?$ |
A. | True |
B. | False |
Answer» B. False | |
7. |
Pumping_be_not_used_in_case_of_concreting_works.$ |
A. | True |
B. | False |
Answer» B. False | |
8. |
Curing is the process of maintaining the moisture and temperature conditions for freshly deployed concrete? |
A. | True |
B. | False |
Answer» B. False | |
9. |
A projecting piece usually provided to support a truss, is __________ |
A. | coping |
B. | cornice |
C. | lintal |
D. | frieze |
Answer» E. | |
10. |
The angular steps used for changing direction of the stairs, are called ___________ |
A. | round steps |
B. | angular steps |
C. | radial steps |
D. | winders |
Answer» E. | |
11. |
The process of making the back ground rough, before plastering, is ___________ |
A. | dubbing |
B. | peeling |
C. | blistering |
D. | hacking |
Answer» E. | |
12. |
The foundations are placed below ground level, to increase ____________ |
A. | stability |
B. | strength |
C. | workability |
D. | life span |
Answer» B. strength | |
13. |
____________is a type of slump test indication. |
A. | Shear slump |
B. | Moment slump |
C. | False slump |
D. | Rigid sump |
Answer» B. Moment slump | |
14. |
The major type of reinforcements used in prestressing is ________ |
A. | circular reinforcement |
B. | spalling reinforcement |
C. | rolling reinforcement |
D. | spiral reinforcement |
Answer» C. rolling reinforcement | |
15. |
What are the steps involved in the concreting process? |
A. | Compacting, Batching, Mixing, Transporting and placing of concrete |
B. | Mixing, Batching, Transporting, placing of concrete and Compacting |
C. | Batching, Mixing, Transporting and placing of concrete, Compacting |
D. | Batching, Placing of concrete, Compacting, Mixing and Transporting |
Answer» D. Batching, Placing of concrete, Compacting, Mixing and Transporting | |