51.

Pick up the item of work not included in the plinth area estimate______________?

A. Wall thickness
B. Room area
C. W.C. area
D. Courtyard area
Answer» E.
52.

Pick up the incorrect statement regarding a master trap from the following ?

A. It is provided in between the lower end of the house drain and the street sewer
B. It is provided a cleaning eye at the top of the trap
C. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
D. The water seal is less than that of ordinary traps
Answer» E.
53.

Pick up the incorrect statement from the following _______?

A. The built up covered area at the floor level of any storey of a building is called plinth area
B. The usable covered area of the rooms of any storey of a building is called carpet area
C. The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area
D. None of these
Answer» E.
54.

Pick up the incorrect statement from the following _____?

A. No deduction is made for the volume occupied by reinforcement
B. No deduction is made for the openings upto 0.1 sq.m
C. No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section
D. None of these
Answer» E.
55.

Pick up the incorrect statement from the following _?

A. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
B. The lead is calculated for each block of the excavated area
C. The unit of lead is 50 m for a distance upto 500 m
D. The unit of lead is 1 km where the lead exceeds 2 km
Answer» E.
56.

Pick up the excavation where measurements are made in square metres for payment ?

A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both B. and C.
Answer» E.
57.

Pick up the correct statement in case of water supply ?

A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. All the above
Answer» E.
58.

Pick up the correct statement from the following _______?

A. All pipes and fittings are classified according to their diameters
B. The diameter of the pipes is the nominal diameter of internal bore
C. All pipes are measured along the centre line of the pipes in metres
D. All the above
Answer» E.
59.

Pick up the correct statement from the following _________?

A. The bent up bars at a support resist the negative bending moment
B. The bent up bars at a support resist the sharing force
C. The bending of bars near supports is generally at 45°
D. All the above
Answer» E.
60.

Pick up the correct statement from the following ________?

A. In a gully trap, a water seal of 6 to 7.5 cm is provided
B. The gully trap collects waste water from the kitchen, sink, wash basins, etc
C. The gully trap disconnects the sullage drain from the main drainage system
D. The grating provided over gully traps is 23 cm square
Answer» C. The gully trap disconnects the sullage drain from the main drainage system
61.

Pick up the correct statement from the following ____?

A. Pointing is measured in sq.m
B. Plastering is measured in sq.m
C. Glazing is measured in sq.m
D. All the above
Answer» E.
62.

Pick up the correct statement from the following ______?

A. Bricks are paid per thousand
B. Cement is paid per 50 kg bag
C. Lime is paid per quintal
D. All the above
Answer» E.
63.

Pick up the correct statement from the following __?

A. In order to check up the average depth of excavation, ‘Dead man s’ are left at the mid-widths of borrow pits
B. The earthwork calculation in excavation is made from the difference in levels obtained with a level
C. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
D. All the above
Answer» E.
64.

Pick up the correct statement from the following ___?

A. If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (F.S.D.)
B. Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope
C. If F.S.L. is above N.S.L the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth
D. All the above
Answer» E.
65.

period in a septic tank is assumed___________________?_x005F_x000D_The detention

A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes
Answer» D. 40 minutes
66.

In the mid-section formula__________________?

A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
D. All of the above
Answer» E.
67.

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?

A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
Answer» C. One fourth breadth of wall on each side
68.

In case of laying gullies, siphons, intercepting traps, the cost includes_______________?

A. Setting and laying
B. Bed concreting
C. Connection to drains
D. All of these
Answer» E.
69.

If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?

A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above
Answer» E.
70.

If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?

A. B + d + Sd
B. Bd + Sd2
C. B × d – Sd1/2
D. ½ (Bd + Sd2)
Answer» C. B × d – Sd1/2
71.

For the construction of buildings, the subheads of the estimate are________________?

A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above
Answer» E.
72.

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?

A. 0.90 m3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3
Answer» C. 0.98 m3
73.

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?

A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3
Answer» D. 0.295 m3
74.

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?

A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %
Answer» E.
75.

Cost of fittings and their fixing is specified for the following sanitary fittings________________?

A. Water closets
B. Flushing pipes
C. Lavatory basins
D. All the above
Answer» E.
76.

Carpet area does not include the area of_________________?

A. The walls along with doors and other openings
B. Bath room and lavatory
C. Kitchen and pantry
D. All the above
Answer» E.
77.

Brick walls are measured in sq. m if the thickness of the wall is_________________?

A. 10 cm
B. 15 cm
C. 20 cm
D. None of these
Answer» B. 15 cm
78.

Berms are provided in canals if these are__________________?

A. Fully in excavation
B. Partly in excavation and partly in embankment
C. Fully in embankment
D. All the above
Answer» C. Fully in embankment
79.

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?

A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above
Answer» E.
80.

Anti-siphonage pipe is connected to__________________?

A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
Answer» D. Side of water closet
81.

According to ISI method of measurement, the order of the sequence is_________________?

A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these
Answer» B. Breadth, length, height
82.

According to Indian Standards Institute, the actual size of modular bricks is_______________?

A. 23 cm × 11.5 cm × 7.5 cm
B. 25 cm × 13 cm × 7.5 cm
C. 19 cm × 9 cm × 9 cmD. 20 cm × 10 cm × 10 cm
Answer» D.
83.

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?

A. 26,000 m3
B. 26,500 m3
C. 27,000 m3
D. 27,500 m3
Answer» E.
84.

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?

A. 500 m3
B. 1000 m 3
C. 1500 m3
D. 2000 m3
Answer» D. 2000 m3
85.

88 is 1400 kg/cm2 and bond stress is 6 kg/cm2, the If tensile stress of a steel rod of diameter required bond length of the rod is____________________?

A. 30 D
B. 39 D
C. 50 D
D. 59 D
Answer» E.