1. |
It is proposed to improve the existing highway for 145 lakhs. Estimate the annual cost of the pavement if it to last for 15 years and the rate of interest is 6%. |
A. | 13.94 lakhs |
B. | 13.49 lakhs |
C. | 14.93 lakhs |
D. | 14.39 lakhs |
Answer» D. 14.39 lakhs | |
2. |
______ is the foundation on which the economic analysis is done. |
A. | Time cost |
B. | Value of money |
C. | Time value of money |
D. | Money value of time |
Answer» D. Money value of time | |
3. |
What is the formula to find the viability of a proposal using the rate of return method? |
A. | (R= frac{0+A-M}{P} 100 ) |
B. | (R= frac{0+A+M}{P} ) |
C. | (R= frac{0+A+M}{P} 100 ) |
D. | (R= frac{0+A-M}{P} ) |
Answer» B. (R= frac{0+A+M}{P} ) | |
4. |
______ is used to refer to for the economic evaluation of highway projects. |
A. | IRC:SP:30-2001 |
B. | IRC:SP:20-2001 |
C. | IRC:SP:30-2009 |
D. | IRC:SP:20-2009 |
Answer» D. IRC:SP:20-2009 | |
5. |
The project is said to be worth undertaking if the benefit-cost ratio is ______ |
A. | Less than 1 |
B. | Less than 5 |
C. | More than 1 |
D. | More than 5 |
Answer» D. More than 5 | |
6. |
The economic analysis is concerned with the source of financing, analysis of cost-benefit to the road users and consequences. |
A. | True |
B. | False |
Answer» C. | |
7. |
Which of the below is not a method used for the economic analysis of the pavements? |
A. | Rate of return method |
B. | Cost-benefit method |
C. | Annual cost method |
D. | Average cost method |
Answer» E. | |