

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Waste Water Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
A proper assessment should be made before sewers are sized or treatment plant capacities are set. |
A. | tTrue |
B. | tFalse |
Answer» B. tFalse | |
2. |
Sewage flow rates vary by source and with a time of the day, the season of the year and weather conditions. |
A. | tTrue |
B. | tFalse |
Answer» B. tFalse | |
3. |
Dry weather flow+ storm water=_________ |
A. | tDry weather flow |
B. | tStormwater |
C. | tWet weather flow |
D. | tSanitary sewage |
Answer» D. tSanitary sewage | |
4. |
Wet weather flow is _________ than the dry weather flow. |
A. | tLower |
B. | tHigher |
C. | tEqual to |
D. | tNot equal to |
Answer» B. tHigher | |
5. |
The quantity of water supply is equal to the rate of supply multiplied by the ______ |
A. | tPopulation |
B. | tQuantity of sewage |
C. | tArea |
D. | tNet usage |
Answer» B. tQuantity of sewage | |