1. |
The type of transition curves generally provided on hill roads, is ________ |
A. | lemniscate |
B. | cubic parabola |
C. | circular |
D. | spiral |
Answer» E. | |
2. |
The distance travelled by revolving the wheel of a vehicle more than its circumferential movement, is known as __________ |
A. | slip |
B. | skid |
C. | slip and skid |
D. | cement |
Answer» C. slip and skid | |
3. |
In water bound macadam roads, binding material, is __________ |
A. | stone dust |
B. | sand |
C. | brick dust |
D. | cement |
Answer» B. sand | |
4. |
The road foundation for modern highways construction, was developed by ____________ |
A. | Tresguet |
B. | Telford |
C. | Macadam |
D. | Telford and Macadam simultaneously. |
Answer» E. | |
5. |
The usual width of parapet walls along Highways in hilly region, is ____________ |
A. | 60 cm |
B. | 20 cm |
C. | 70 cm |
D. | 40 cm |
Answer» B. 20 cm | |
6. |
Thickness of a pavement may be reduced considerably by ________ |
A. | Drainage of soil |
B. | Stabilisation of soil |
C. | Compaction of soil |
D. | Drainage of soil, Stabilisation of soil and Compaction of soil |
Answer» E. | |