1. |
One of the major advantage of process oriented layout is |
A. | High equipment utilization |
B. | Large work in process inventories |
C. | Flexibility in equipment and labour assignment |
D. | Smooth and continuous flows of work |
Answer» D. Smooth and continuous flows of work | |
2. |
A ________ is the combination of layout types. |
A. | Hybrid layout |
B. | Site layout |
C. | Block layout |
D. | Detailed layout |
Answer» B. Site layout | |
3. |
Which among the following is a special factor that influences the plant location? |
A. | Cultural factor |
B. | Infrastructure |
C. | Communication facilities |
D. | Transport |
Answer» B. Infrastructure | |
4. |
Which scheduling technique should be employed when due dates are important for a job order ? |
A. | Forward scheduling |
B. | Loading |
C. | Dispatching |
D. | Backward scheduling |
Answer» E. | |
5. |
The activities and process used in making both tangible and intangible products is known as |
A. | Manufacturing |
B. | Production |
C. | Operations |
D. | The transformation process |
Answer» C. Operations | |
6. |
Two effective global strategies adopted by firms are _________and |
A. | Strategic alliance, make-to-order |
B. | Strategic alliance, assemble-to-order |
C. | Assemble-to-order, make-to-order |
D. | Strategic alliance, locating operations abroad |
Answer» E. | |
7. |
If an artificial variable remains in the solution with a positive value after the stopping criterion has been reached, the problem |
A. | is infeasible |
B. | is optimal |
C. | needs a new basis |
D. | has more than one solution |
Answer» B. is optimal | |
8. |
Which among the following methods is used when both distance and load have to be considered for optimality in terms of cost? |
A. | Factor rating |
B. | Rating plan |
C. | Centre of gravity |
D. | Point rating |
Answer» D. Point rating | |
9. |
Which of the following is not a benefit of small production lots ? |
A. | Work in process inventory is smaller |
B. | Fewer setups |
C. | Workstation can be placed closed together |
D. | Manufacturing cycle time is shorter |
Answer» C. Workstation can be placed closed together | |
10. |
For which of the following options is make-to-stock strategy feasible? 1. To produce customized products from sub-assemblies 2. To make standardized products with high volumes 3. To accommodate flexibility and offer variety 4. Where forecast is reasonably accurate |
A. | Options 2 & 4 |
B. | Options 1 & 4 |
C. | Options 1 & 2 |
D. | Options 1 & 3 |
Answer» B. Options 1 & 4 | |
11. |
__________________ involves understanding the scope and various processes in a project cycle. |
A. | Project management |
B. | Total quality management |
C. | Process management |
D. | Program management |
Answer» B. Total quality management | |
12. |
Consider the below mentioned statements: 1. Without the forecast, no production function can be taken up. 2 Forecasts are subject to market dynamics and many other predictable parameters which will be known and controllable. State True or False: |
A. | 1-True, 2-True |
B. | 1-False, 2-True |
C. | 1-False, 2-False |
D. | 1-True. 2-False |
Answer» E. | |
13. |
_________is a process in which a supplier generates orders for its distributor based on demand information sent by the distributor |
A. | point of sale |
B. | integrated supply chain management |
C. | distributed control system |
D. | vendor managed inventory |
Answer» E. | |
14. |
Project process is classified into two main categories and |
A. | Project management process, planning process |
B. | Initiating process, product oriented process |
C. | Product oriented process, project management process |
D. | Planning processes, initiating process |
Answer» D. Planning processes, initiating process | |
15. |
A set of simultaneous equations that has more variables than constraints has |
A. | no solution |
B. | an infinite number of solutions |
C. | a finite solution |
D. | an infinite solution |
Answer» C. a finite solution | |
16. |
Ascertain type of computer costs 1000 and the annual holding cost is 25% . annual demand is 10000 units , and the order cost is 150 per order .what is the approximate economic order quantity? |
A. | 70 |
B. | 110 |
C. | 250 |
D. | 12000 |
Answer» C. 250 | |
17. |
Which of the following is the creation of database, by developers in association with the business analyst, to generate diagrams and documentation? |
A. | Logical model |
B. | Physical model |
C. | Data model |
D. | Process model |
Answer» C. Data model | |
18. |
Flexible manufacturing systems (FMS) are reported to have a number of benefits . which is not a reported benefits of FMS? |
A. | Increased quality |
B. | More flexible than the manufacturing systems they replace |
C. | Lead time and throughout time reduction |
D. | Increased utilization |
Answer» C. Lead time and throughout time reduction | |
19. |
Process oriented layout is best suited for |
A. | The assembly of products like automobiles and appliances |
B. | The mass production of uniform products |
C. | High volume , low variety production |
D. | Low volume , high variety production |
Answer» E. | |
20. |
Which of the following functions is not a core function of an organization |
A. | The accounting and finance function |
B. | The marketing (including sale) function |
C. | The operation function |
D. | The product or service development function |
Answer» B. The marketing (including sale) function | |
21. |
The outcomes of the logical model and physical model are called the_____________ and______________ |
A. | Control flow diagrams, business process diagrams |
B. | Business process diagrams, data flow diagrams |
C. | Entity relationship diagrams, business process diagrams |
D. | Entity relationship diagrams, control flow diagrams |
Answer» D. Entity relationship diagrams, control flow diagrams | |
22. |
Which of the following are the features of process layout? 1 Emphasis is on special orders or products having significant and frequent design changes. 2. Standardized product with little or no design changes. 3. Minimum requirement of in-process inspection. 4 Use of general purpose machines. |
A. | Options 3 & 4 |
B. | Options 1 & 4 |
C. | Options 1 & 2 |
D. | Options 2 & 3 |
Answer» C. Options 1 & 2 | |
23. |
Operations can be classified according to the degree of variations in demand and visibility of the operations as well as their volume and variety of production which of the following operations would be classified as high variation & high visibility ? |
A. | A front office staff |
B. | A family doctor |
C. | A carpenter |
D. | A fast food restaurant |
Answer» C. A carpenter | |
24. |
Unique products are generally produced through |
A. | Customization |
B. | Standardization |
C. | Engineering |
D. | Mechanization |
Answer» B. Standardization | |
25. |
In which of the following the promotional programs may also be used to shift demand? |
A. | Chase demand strategy |
B. | Level production strategy |
C. | Stable work-force strategy |
D. | Mixed strategy |
Answer» C. Stable work-force strategy | |
26. |
_________ plan and manage the project on a day-to-day basis for this stage _________ define the coordination, control activities and identify the suitable personnel to carry them out. |
A. | Project coordinators, stage teams |
B. | Stage managers, project coordinators |
C. | Stage teams, key stakeholders |
D. | Stage managers, key stakeholders |
Answer» C. Stage teams, key stakeholders | |
27. |
The typical goal used when developing a process oriented layout strategy is to |
A. | Minimize the distance between adjacent departments |
B. | Minimize the material handling costs |
C. | Maximize the number of different tasks which can be performed by an individual machine |
D. | Minimize the level of operator skill necessary |
Answer» C. Maximize the number of different tasks which can be performed by an individual machine | |
28. |
________________ helps in production management by developing an overall plan. |
A. | Aggregate plan |
B. | Business plan |
C. | Marketing plan |
D. | Architectural plan |
Answer» B. Business plan | |
29. |
Resources such as labour materials and energy are known as ……………. In the transformation process |
A. | Output |
B. | Intangibles |
C. | Factors of production |
D. | Inputs |
Answer» E. | |
30. |
Time and motion studies focus on |
A. | The time and effort it takes to train a new employee |
B. | The number of physical motion required to complete a work related task |
C. | The ways in which machines can be built to make human safes and more efficient |
D. | Ways to avoid injury in tasks that required repetitive motion |
Answer» C. The ways in which machines can be built to make human safes and more efficient | |
31. |
Forward scheduling |
A. | Begins with a delivery date ,then each operations is offset one at a time ,in reverse order |
B. | Is well suited where the supplier is usually able to meet precise delivery dates |
C. | Tends to minimize in process inventory |
D. | Assumes that procurement of material and operations start as soon as requirement are known |
Answer» E. | |
32. |
Making identical , interchangeable components or complete products is referred to as |
A. | Customization |
B. | Standardization |
C. | Engineering |
D. | Mechanization |
Answer» C. Engineering | |
33. |
Use of sequencing role shortest processing time generally result in |
A. | Minimum average lateness |
B. | Maximum utilization |
C. | Maximum effectiveness |
D. | Minimum average flow time |
Answer» E. | |
34. |
Which of the following is not an element of management process |
A. | Pricing |
B. | Staffing |
C. | Planning |
D. | Controlling |
Answer» B. Staffing | |
35. |
Which of the following are the factors on which the choice of a forecasting method depends? 1. Data availability 2. Product life cycle 3. Accuracy required 4. Volume of demand |
A. | Options 1 & 2 |
B. | Options 2 & 4 |
C. | Options 1 & 3 |
D. | Options 2 & 3 |
Answer» D. Options 2 & 3 | |
36. |
The concept of total quality control i.e that quality must be attended to at all stages of the industrial cycle and throughout the organization is the creation of which of the following pioneers ? |
A. | Genichi Taguchi |
B. | W.Edward Deming |
C. | Arnald Feigenbaum |
D. | Joseph M juran |
Answer» D. Joseph M juran | |
37. |
is the process of estimating, routing, and scheduling. |
A. | Planning |
B. | Controlling |
C. | Implementing |
D. | Functioning |
Answer» B. Controlling | |
38. |
Big advantage of process oriented layout is |
A. | Its flexibility for variety |
B. | Its low cost |
C. | The simplified scheduling problem presented by this layout strategy |
D. | The ability of employ low skilled labour |
Answer» B. Its low cost | |
39. |
In a large company , the department charged with determining the actual process to be used in turning inputs to output is |
A. | Marketing research |
B. | Engineering |
C. | Operations |
D. | Product planning |
Answer» D. Product planning | |
40. |
The man issue is designing process oriented input concerns the relative positioning of …………… to minimize cost of material handling |
A. | Work stations |
B. | Departments |
C. | Raw materials |
D. | Entrances , loading docks etc. |
Answer» C. Raw materials | |
41. |
The five element in the management process are |
A. | Plan ,direct , update, lead & surprise |
B. | Accounting /finance , marketing, operations and management |
C. | Organize , plan , control, staff and manage |
D. | Plan, organize, staff , lead and control |
Answer» D. Plan, organize, staff , lead and control | |
42. |
Aggregate planning is the primary responsibility of the _______________ department. |
A. | Accounting |
B. | Finance |
C. | Operations |
D. | Human resources and marketing |
Answer» D. Human resources and marketing | |
43. |
What type of process would a paper mill be most likely to use? |
A. | Continuous flow |
B. | Project |
C. | Job shop |
D. | Flow shop |
Answer» B. Project | |
44. |
Which of the following would not be normally considered as a key feature of operations management? |
A. | Most new technology is implemented |
B. | World class operations can give an organization competitive advantage |
C. | Operations researches mathematical techniques for optimizing process |
D. | Operations is the part of an organization which creates wealth through the management of the transformation process |
Answer» E. | |
45. |
_____________________ involves the activities of a manufacturing company with its suppliers. |
A. | Internal supply chain |
B. | Upstream supply chain |
C. | In-house processes |
D. | Downstream supply chain |
Answer» C. In-house processes | |
46. |
Because the fixed position layout is so difficult to solve on-site operations managers |
A. | Virtually never employ this layout strategy |
B. | Utilize this approach only for construction projects such as bridges and office towers |
C. | Increase in size of site |
D. | Often complete as much of the project as possible off site |
Answer» E. | |
47. |
What type of control chart is used to monitor the number of defects per unit? |
A. | p-chart |
B. | R-chart |
C. | c-chart |
D. | x-bar chart |
Answer» D. x-bar chart | |
48. |
Reduction of in-transit inventory encouraged through use of |
A. | Supplier location near plants |
B. | Low cost , global suppliers |
C. | Low carrying cost |
D. | Use of trains , not trucks |
Answer» B. Low cost , global suppliers | |
49. |
What do flexible manufacturing systems (FMS) do? |
A. | Moves materials between opportunities |
B. | Moves and manipulates products , parts on tolls |
C. | Co-ordinates the whole process of manufacturing and manufactures a part, components or products |
D. | Completely manufactures a range of components without significant human inventions during the processing |
Answer» E. | |
50. |
Which of the following illustrate an activity that does not add value? |
A. | Training employees |
B. | Ordering parts from a supplier |
C. | Making a part |
D. | Accumulating parts in front of the next work centre |
Answer» E. | |