| 1. |
in ______ type of crane, heavy temporary staging or platform is prepared for the working of the crane. |
| A. | Cableways |
| B. | Swing jib |
| C. | Goliath |
| D. | Platform |
| Answer» D. Platform | |
| 2. |
cast in situ piles may be classified in to_______. |
| A. | Three |
| B. | Eight |
| C. | Two |
| D. | Four |
| Answer» D. Four | |
| 3. |
______ are extra wagons attached to the tractors or trucks. |
| A. | Elevators |
| B. | Conveyors |
| C. | Trailers |
| D. | Dumper |
| Answer» D. Dumper | |
| 4. |
______ is to be incorporated as a part of a permanent structure whichhave been proved to be economical. |
| A. | Suspended cofferdam |
| B. | Single wall cofferdam |
| C. | Cellular cofferdam |
| D. | Concrete cofferdam |
| Answer» E. | |
| 5. |
_______ consists of a large bucket which is attached to a tractor. |
| A. | Bulldozer |
| B. | Scraper |
| C. | Grader |
| D. | Escalator |
| Answer» C. Grader | |
| 6. |
the equipment having a bucket is? |
| A. | Shovel |
| B. | Clam shell |
| C. | Dragline |
| D. | Hoe |
| Answer» C. Dragline | |
| 7. |
the ______ is suitable for caissons of open well type. |
| A. | Steel |
| B. | Timber |
| C. | Reinforced cement concrete |
| D. | Cast-iron |
| Answer» E. | |
| 8. |
______ type of excavator used for digging the foundation trenchesbelow operating level. |
| A. | Clamshell |
| B. | Backactor |
| C. | Power shovel |
| D. | Skimmer |
| Answer» C. Power shovel | |
| 9. |
_______ is the simplest form of cofferdam. |
| A. | Single wall cofferdam |
| B. | Earth fill cofferdam |
| C. | Cellular cofferdam |
| D. | Rock fill Cofferdam |
| Answer» C. Cellular cofferdam | |
| 10. |
the term _____ is used to indicate the process of allocating a prepaid expense to accounting periods during which there are benefits realized from the depreciable equipment. |
| A. | Cost depreciation |
| B. | Investment charges |
| C. | Maintenance and repair |
| D. | Operating cost |
| Answer» B. Investment charges | |
| 11. |
Modern pile driving method was first invented by ________. |
| A. | Romans |
| B. | Nasmyth |
| C. | Terzaghi |
| D. | Vitruvious |
| Answer» C. Terzaghi | |
| 12. |
when the area to be enclosed is large, it becomes essential to provide the ______ construction so as to give stability to the cofferdam. |
| A. | Single wall cofferdam |
| B. | Cellular cofferdam |
| C. | Double wall cofferdam |
| D. | Suspended cofferdam |
| Answer» D. Suspended cofferdam | |
| 13. |
effective compaction is not achieved by ________. |
| A. | Rubber tyred |
| B. | Sheep’s foot |
| C. | Pneumatic |
| D. | Smooth wheeled |
| Answer» E. | |
| 14. |
a ______ is an oldest type of machine which removes earth. |
| A. | Escalator |
| B. | Excavator |
| C. | Elevator |
| D. | Bulldozer |
| Answer» C. Elevator | |
| 15. |
the compaction of sand is done by ______. |
| A. | Rollers |
| B. | Animals |
| C. | Vibrator |
| D. | Jetting |
| Answer» E. | |
| 16. |
a ______ is used to level the ground and spreads the loose material. |
| A. | Excavator |
| B. | Scraper |
| C. | Grader |
| D. | Tractor |
| Answer» D. Tractor | |
| 17. |
pyramid is a type of ______ structure. |
| A. | Triangulated |
| B. | Massive |
| C. | Pneumatic |
| D. | Framed |
| Answer» C. Pneumatic | |
| 18. |
which of the following piles is a cast in situ type of concrete pile? |
| A. | Under reamed pile |
| B. | Raymond standard pile |
| C. | Pressure pile |
| D. | Anchor pile |
| Answer» C. Pressure pile | |
| 19. |
the formwork from the sides of beams can be removed only after |
| A. | 1 day |
| B. | 4 days |
| C. | 7 days |
| D. | 14 days |
| Answer» B. 4 days | |
| 20. |
a ______ is a very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc. |
| A. | Scraper |
| B. | Grader |
| C. | Excavator |
| D. | Bulldozer |
| Answer» E. | |
| 21. |
in ______ method, it is assumed that a property loses its value by the same amount every year. |
| A. | Sinking fund |
| B. | Operating cost |
| C. | Constant percentage |
| D. | Straight line method |
| Answer» E. | |
| 22. |
from given below, which method for the dewatering of foundation trenches is portable and can be easily moved when required. |
| A. | Pumping |
| B. | Well point system |
| C. | Freezing process |
| D. | Electro osmosis process |
| Answer» B. Well point system | |
| 23. |
the term _____ is used to indicate the period during which the equipment is not in ideal condition. |
| A. | Depreciation |
| B. | Downtime |
| C. | Inadequacy |
| D. | Normal deterioration |
| Answer» C. Inadequacy | |
| 24. |
_______ is a self-propelled machine which is used mainly to exert a powerful tractive force for pulling other machines. |
| A. | Tractor |
| B. | Bulldozer |
| C. | Angle dozer |
| D. | Scraper |
| Answer» B. Bulldozer | |
| 25. |
______ are very useful for horizontal transportation of materials likebricks, aggregates, scaffoldings, etc. |
| A. | Elevators |
| B. | Escalators |
| C. | Dumpers |
| D. | Conveyors |
| Answer» D. Conveyors | |
| 26. |
______ crane is used for open sites and it possesses a very long reach. |
| A. | Goliath |
| B. | Derrick |
| C. | Swing jib |
| D. | Cable |
| Answer» C. Swing jib | |
| 27. |
______ it suitable when available working space is limited and the areato be enclosed is small. |
| A. | Single wall cofferdam |
| B. | Double wall cofferdam |
| C. | Dikes |
| D. | Concrete cofferdam |
| Answer» B. Double wall cofferdam | |
| 28. |
______ are cranes of swing jib type and are mounted on high steeltowers. |
| A. | Cableways |
| B. | Swing jib |
| C. | Tower |
| D. | Goliath |
| Answer» D. Goliath | |
| 29. |
the boom is supported by _______. |
| A. | Cab |
| B. | Dipper stick |
| C. | Hoist line |
| D. | Crawler |
| Answer» D. Crawler | |
| 30. |
______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure. |
| A. | Chemical grouting |
| B. | Cement grouting |
| C. | Freezing process |
| D. | Electro osmosis process |
| Answer» C. Freezing process | |
| 31. |
a______ can be used on wet ground and in all conditions of weather. |
| A. | Grader |
| B. | Scraper |
| C. | Escalator |
| D. | Bulldozer |
| Answer» E. | |
| 32. |
single acting hammers provide an advantage in _______ type of soil. |
| A. | Compact soil and hard soil |
| B. | Light weight soil |
| C. | None of the mentioned |
| D. | All of the mentioned |
| Answer» B. Light weight soil | |
| 33. |
the art of driving piles into the ground was first established by______. |
| A. | Greeks |
| B. | Romans |
| C. | Philippians |
| D. | None of the mentioned |
| Answer» C. Philippians | |
| 34. |
the best time to remove soil is during ______. |
| A. | Summer |
| B. | Winter |
| C. | Rainy season |
| D. | During storm |
| Answer» B. Winter | |
| 35. |
in which method a refrigeration plan of required capacity is need to beinstalled near the site of work. |
| A. | Pumping |
| B. | Well point system |
| C. | Freezing process |
| D. | Electro osmosis process |
| Answer» D. Electro osmosis process | |
| 36. |
what is the equipment used for short haul distance of 100 m? |
| A. | Bulldozer |
| B. | Scrapper |
| C. | Power shovel |
| D. | Hoe |
| Answer» B. Scrapper | |
| 37. |
composite piles are suitable for ______. |
| A. | Maximum design load |
| B. | Project above the water table |
| C. | Compacting the soil |
| D. | Protect water front structures |
| Answer» C. Compacting the soil | |
| 38. |
a _____ caisson is open at top and closed at bottom. |
| A. | Wells |
| B. | Pneumatic caissons |
| C. | Cylinders |
| D. | Box caissons |
| Answer» E. | |
| 39. |
______ type of excavator is used for digging at or below the operatinglevel. |
| A. | Skimmer |
| B. | Dragline |
| C. | Power shovel |
| D. | Dredger |
| Answer» C. Power shovel | |
| 40. |
the ______ compact soil close to the earth surface only. |
| A. | Earth rammers |
| B. | Vibrating rollers |
| C. | Ditcher |
| D. | Skimmer |
| Answer» B. Vibrating rollers | |
| 41. |
dragline cannot excavate _______. |
| A. | Soft rock |
| B. | Black cotton soil |
| C. | Clay |
| D. | Stiff material |
| Answer» E. | |
| 42. |
the ______ was used as a material for the construction of caisson in theearly stages of development of caisson. |
| A. | Steel |
| B. | Timber |
| C. | Cast iron |
| D. | RCC |
| Answer» C. Cast iron | |
| 43. |
a ______ is a caisson which is open at top as well as at bottom. |
| A. | Well |
| B. | Box caisson |
| C. | Pneumatic caissons |
| D. | Cofferdam |
| Answer» B. Box caisson | |
| 44. |
the ______ is made of steel sheet piles and this type of cofferdam isproved successful in unwatering large areas. |
| A. | Suspended cofferdam |
| B. | Cellular cofferdam |
| C. | Dikes |
| D. | Concrete cofferdam |
| Answer» C. Dikes | |
| 45. |
the organic chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches. |
| A. | Well point system |
| B. | Cement grouting |
| C. | Chemical grouting |
| D. | Electro osmosis process |
| Answer» D. Electro osmosis process | |
| 46. |
______ type of cofferdam is economical at places where rock isavailable in plenty. |
| A. | Earth dikes |
| B. | Sand bag Dikes |
| C. | Rock fill cofferdam |
| D. | Single wall cofferdam |
| Answer» D. Single wall cofferdam | |
| 47. |
______ type of excavator carries the skimmer at its lower end. |
| A. | Skimmer |
| B. | Dredger |
| C. | Escalator |
| D. | Elevator |
| Answer» B. Dredger | |
| 48. |
based on the function, piles can be classified into ______ types. |
| A. | 4 |
| B. | 6 |
| C. | 8 |
| D. | 3 |
| Answer» D. 3 | |
| 49. |
a grader which is told by a tractor is known as _________. |
| A. | Tractor grader |
| B. | Motor grader |
| C. | Scraper |
| D. | Elevating grader |
| Answer» E. | |
| 50. |
the precast concrete piles are generally used for a maximum design loadof about _______. |
| A. | 50 tonnes |
| B. | 100 tonnes |
| C. | 75 tonnes |
| D. | 80 tonnes |
| Answer» E. | |