MCQOPTIONS
Saved Bookmarks
This section includes 14 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
THE_EFFICIENCY_OF_P-CHARTS_IS_______THE_EFFICIENCY_OF_THE_X_BAR_AND_R_CHARTS_WHEN_P_IS_CLOSER_TO_0.5.?$ |
| A. | Equal to |
| B. | More than |
| C. | Less than |
| D. | Non-predictable |
| Answer» C. Less than | |
| 2. |
When a change in product specification is desired, which of these control charts should be used?$ |
| A. | p-charts |
| B. | <span style="text-decoration:overline;">x</span> And R charts |
| C. | c-charts |
| D. | u-charts |
| Answer» C. c-charts | |
| 3. |
Which_of_these_is_most_economical_in_long_term?$ |
| A. | <span style="text-decoration:overline;">x</span> And R charts |
| B. | c-chart |
| C. | p-chart |
| D. | u-chart |
| Answer» B. c-chart | |
| 4. |
Proper type of control charts to be prepared, must be chosen after choosing the point in the process at which the control charts will be implemented. |
| A. | True |
| B. | False |
| Answer» C. | |
| 5. |
Before choosing which CTQ-characteristic to be controlled, control chart must be chosen. |
| A. | True |
| B. | False |
| Answer» C. | |
| 6. |
In regulated industries, where process stability and process capability must be continually demonstrated _____ charts are used. |
| A. | <span style="text-decoration:overline;">x</span> And s |
| B. | p |
| C. | c |
| D. | u |
| Answer» B. p | |
| 7. |
When we want to troubleshoot the out-of-control process, we use____ control charts? |
| A. | <span style="text-decoration:overline;">x</span> |
| B. | p |
| C. | c |
| D. | u |
| Answer» B. p | |
| 8. |
The efficiency of variable control charts is ____ the efficiency of the p-charts when p is small and far away from 0.5? |
| A. | Lesser than |
| B. | More than |
| C. | Equal to |
| D. | Non-predictable |
| Answer» C. Equal to | |
| 9. |
X bar and R charts are _____ indicators of trouble. |
| A. | Trailing |
| B. | Inferior |
| C. | Leading |
| D. | Secondary |
| Answer» D. Secondary | |
| 10. |
Which of these is an advantage of attribute control chart? |
| A. | Much useful information about the process performance can be gathered |
| B. | Mean and variability is obtained directly |
| C. | One quality characteristic is observed at a time |
| D. | Several quality characteristics can be considered jointly |
| Answer» E. | |
| 11. |
Which of the charts are more efficient to find out variability in the data when the sample size is more than 10? |
| A. | R-chart |
| B. | c-chart |
| C. | s-chart |
| D. | p-chart |
| Answer» D. p-chart | |
| 12. |
Which of the control chart is used to find out variability in the data? |
| A. | s-chart |
| B. | <span style="text-decoration:overline;">x</span>-chart |
| C. | p-chart |
| D. | c-chart |
| Answer» B. <span style="text-decoration:overline;">x</span>-chart | |
| 13. |
What type of control chart can be used to plot “number of defectives in the output of a process for making a machine part” data?$ |
| A. | p-chart |
| B. | c-chart |
| C. | u-chart |
| D. | s-chart |
| Answer» B. c-chart | |
| 14. |
The number of defects per unit of a casting process output, is plotted on ____ chart |
| A. | x bar |
| B. | s-chart |
| C. | u-chart |
| D. | p-chart |
| Answer» D. p-chart | |