

MCQOPTIONS
Saved Bookmarks
This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Survey stations may be marked on the ground using a: |
A. | Pole |
B. | Rod |
C. | Pointer |
D. | Peg |
Answer» E. | |
2. |
How many types of cross staff are available? |
A. | 2 |
B. | 5 |
C. | 3 |
D. | 4 |
Answer» D. 4 | |
3. |
The book in which chain measurements are entered is called: |
A. | Field book |
B. | Record book |
C. | Study book |
D. | Chain book |
Answer» B. Record book | |
4. |
Gunter’s chain consists of _________ links. |
A. | 500 |
B. | 50 |
C. | 1000 |
D. | 100 |
Answer» E. | |
5. |
THE_BOOK_IN_WHICH_CHAIN_MEASUREMENTS_ARE_ENTERED_IS_CALLED:?$ |
A. | Field book |
B. | Record book |
C. | Study book |
D. | Chain book |
Answer» B. Record book | |
6. |
Survey stations may be marked on the ground using a:$ |
A. | Pole |
B. | Rod |
C. | Pointer |
D. | Peg |
Answer» E. | |
7. |
How_many_types_of_cross_staff_are_available?$ |
A. | 2 |
B. | 5 |
C. | 3 |
D. | 4 |
Answer» D. 4 | |
8. |
In how many ways can ranging be carried out? |
A. | 2 |
B. | 3 |
C. | 4 |
D. | 5 |
Answer» B. 3 | |
9. |
Chain surveying uses the principle of: |
A. | Traversing |
B. | Chaining |
C. | Ranging |
D. | Triangulation |
Answer» E. | |
10. |
The biggest of the survey line is called: |
A. | First line |
B. | Base line |
C. | Tie line |
D. | Main survey line |
Answer» C. Tie line | |
11. |
The process of a location of intermediate points on a survey line is: |
A. | Aligning |
B. | Extending |
C. | Ranging |
D. | Offsetting |
Answer» D. Offsetting | |
12. |
Gunter’s chain consists of _________ links.$ |
A. | 500 |
B. | 50 |
C. | 1000 |
D. | 100 |
Answer» E. | |
13. |
How many types of chains are used in chain surveying? |
A. | 4 |
B. | 5 |
C. | 6 |
D. | 8 |
Answer» C. 6 | |
14. |
Which of the below is not an instrument used to set right angles? |
A. | Cross staff |
B. | Site square |
C. | Optical staff |
D. | Prism square |
Answer» D. Prism square | |
15. |
An offset is a _________ distance of an object measured from the survey line. |
A. | Lateral |
B. | Horizontal |
C. | Normal |
D. | Inclined |
Answer» B. Horizontal | |