Explore topic-wise MCQs in Computer Organization.

This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Organization knowledge and support exam preparation. Choose a topic below to get started.

1.

The transmission on the asynchronous BUS is also called _____

A. Switch mode transmission
B. Variable transfer
C. Bulk transfer
D. Hand-Shake transmission
Answer» E.
2.

The meter in and out lines are used for __________

A. Monitoring the usage of devices
B. Monitoring the amount of data transferred
C. Measure the CPU usage
D. None of the mentioned
Answer» B. Monitoring the amount of data transferred
3.

In IBM s S360/370 systems _____ lines are used to select the I/O devices.

A. SCAN in and out
B. Connect
C. Search
D. Peripheral
Answer» B. Connect
4.

The MSYN signal is initiated __________

A. Soon after the address and commands are loaded
B. Soon after the decoding of the address
C. After the slave gets the commands
D. None of the mentioned
Answer» C. After the slave gets the commands