MCQOPTIONS
Saved Bookmarks
This section includes 21 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
the precast concrete piles are generally used for a maximum design load of about _______. |
A. | 50 tonnes |
B. | 100 tonnes |
C. | 75 tonnes |
D. | 80 tonnes |
Answer» E. | |
2. |
the piles that are used for protecting structures from ships and floating object is _______. |
A. | Anchor piles |
B. | Fender piles |
C. | Compaction Piles |
D. | Batter Piles |
Answer» C. Compaction Piles | |
3. |
piles are commonly driven in to the ground by means of special device called _______. |
A. | Pile driver and hammer |
B. | Driller |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» B. Driller | |
4. |
______ type of cofferdam is economical at places where rock is available in plenty. |
A. | Earth dikes |
B. | Sand bag Dikes |
C. | Rock fill cofferdam |
D. | Single wall cofferdam |
Answer» D. Single wall cofferdam | |
5. |
if a hammer is raised by stem and allowed to fall by gravity on top of the pile, it is called as ______. |
A. | Diesel hammer |
B. | Vibratory hammer |
C. | Single acting hammer |
D. | Drop hammer |
Answer» D. Drop hammer | |
6. |
______ it suitable when available working space is limited and the area to be enclosed is small. |
A. | Single wall cofferdam |
B. | Double wall cofferdam |
C. | Dikes |
D. | Concrete cofferdam |
Answer» B. Double wall cofferdam | |
7. |
in _______, the owner has to invest a certain amount for the purchase of an equipment. |
A. | Cost depreciation |
B. | Investment charges |
C. | Operation cost |
D. | Management |
Answer» C. Operation cost | |
8. |
______ type of excavator is used for digging below, at or above operating level in a vertical range. |
A. | Skimmer |
B. | Dragline |
C. | Clamshell |
D. | Back trench |
Answer» D. Back trench | |
9. |
______ type of excavator used for digging the foundation trenches below operating level. |
A. | Clamshell |
B. | Backactor |
C. | Power shovel |
D. | Skimmer |
Answer» C. Power shovel | |
10. |
______ type of excavator is used for digging at or below the operating level. |
A. | Skimmer |
B. | Dragline |
C. | Power shovel |
D. | Dredger |
Answer» C. Power shovel | |
11. |
a _____ roller is a multi-purpose roller which is used for various purposes and for practically all type of roads. |
A. | Smooth wheeled |
B. | Pneumatic |
C. | Rubber tyred |
D. | Dead weight |
Answer» B. Pneumatic | |
12. |
______ are very useful for horizontal transportation of materials like bricks, aggregates, scaffoldings, etc. |
A. | Elevators |
B. | Escalators |
C. | Dumpers |
D. | Conveyors |
Answer» D. Conveyors | |
13. |
______ are cranes of swing jib type and are mounted on high steel towers. |
A. | Cableways |
B. | Swing jib |
C. | Tower |
D. | Goliath |
Answer» D. Goliath | |
14. |
the ______ was used as a material for the construction of caisson in the early stages of development of caisson. |
A. | Steel |
B. | Timber |
C. | Cast iron |
D. | RCC |
Answer» C. Cast iron | |
15. |
the ______ is found to be the most suitable material for the construction of caisson. |
A. | Timber |
B. | Cast iron |
C. | Steel |
D. | RCC |
Answer» D. RCC | |
16. |
which the given method is used for dewatering of the foundation trenches. |
A. | Deep boring |
B. | Geophysical method |
C. | Well point system |
D. | Analytical method |
Answer» D. Analytical method | |
17. |
in which method a refrigeration plan of required capacity is need to be installed near the site of work. |
A. | Pumping |
B. | Well point system |
C. | Freezing process |
D. | Electro osmosis process |
Answer» D. Electro osmosis process | |
18. |
______ are the cofferdams which can be lifted, floated and placed in another position as soon as its purpose is served. |
A. | Suspended cofferdam |
B. | Double wall cofferdam |
C. | Dike cofferdam |
D. | Single wall cofferdam |
Answer» B. Double wall cofferdam | |
19. |
______ are used for vertical transportation of aggregate and wet concrete on large project sites. |
A. | Elevators |
B. | Trucks |
C. | Conveyors |
D. | Escalators |
Answer» B. Trucks | |
20. |
the ______ is made of steel sheet piles and this type of cofferdam is proved successful in unwatering large areas. |
A. | Suspended cofferdam |
B. | Cellular cofferdam |
C. | Dikes |
D. | Concrete cofferdam |
Answer» C. Dikes | |
21. |
______ is to be incorporated as a part of a permanent structure which have been proved to be economical. |
A. | Suspended cofferdam |
B. | Single wall cofferdam |
C. | Cellular cofferdam |
D. | Concrete cofferdam |
Answer» E. | |