While selecting the location of an intake for collecting surface water, the factor considered, is |
A. | The intake point should be near as far as possible to the treatment plant |
B. | The intake point should be in purer zone of the water source |
C. | The intake point should be upstream of the point of disposal of waste water |
D. | The intake point in meandering rivers should be on concave banks |
Answer» E. | |